My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01276
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:41 PM
Creation date
10/4/2006 6:52:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/13/1995
Description
Agenda or Table of Contents, Minutes, Memos - Special Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Memo to Colorado Water Conservation Board <br />From Peter Evans and E.l.Jencsok <br />December 5,1995 <br />Re: Endangered Fish Instream Flow Water Rights, "15 Mile Reach," eolo. River <br />Page 2 <br /> <br />. <br /> <br />"Relationships between How and Rare Fish Habitat in the '15-Mile Reach' of the <br />Upper Colorado River" - May 1995 <br />The Service considers the May 1995 report to contain the most current flow <br />recommendations, and as a result, it supersedes the previous Service flow recommendations <br />developed for the 15 Mile Reach. The Board and its staff and eolorado Division of Wildlife <br />(CDOW) staff have reviewed these reports and studies at various meetings and workshops. <br />These .cCuWlllendations and reports were summarized in the memorandum to the Board dated <br />October 17, 1995. <br />Workshops and Special Board Meetings: A number of Board workshops and special <br />meetings were held during 1995 in addition to regularly scheduled bimonthly Board meetings to <br />discuss the Service's proposed flow recommendations, the physical and legal water availability of <br />water for appropriation and alternative approaches for the appropriation, protection and <br />atlmini~tration of instream flow water rights for the endangered fish in the 15 Mile Reach 9f the <br />Colorado River. Public comment was taken at all of these meetings. The following meetings <br />were held: <br />RelPllar Board Meetings <br />May 22-23, 1995 (Granby) <br />July 24-25, 1995 (Denver) <br />September7-8, 1995 (Lamar) <br />November6-7,1995 (Denver) <br /> <br />Special Board Meetings <br />October 10, 1995 (Craig) <br />October 20, 1995 (Grand Junction) <br /> <br />. <br /> <br />. <br /> <br />WorkshQps <br />July 5,1995 (Denver) <br />August 22, 1995 (Grand Junction) <br />August 23, 1995 (Summit-County) <br />August 31,1995 (Denver) <br />September 26, 1995 (Denver) <br />November 29,1995 (Denver) <br />Preliminary Notice: Preliminary Notice for the 15 Mile Reach was issued on September <br />15, 1995 and distributed to the interested parties mailing list announcing that the Board would <br />consider public input and formally initiate discussions on whether or not to appropriate the <br />instream flows for the endangered fish at its October 20, 1995 special meeting in Grand Junction, <br />Colorado. The Board received public comment at this meeting. Based on the comments <br />received at and prior to the October 20, 1995 special meeting, changes were made to the <br />Preliminary Notice which are reflected in the Final Notice. <br />Final Notice: A Final Notice was prepared for distribution to all interested parties on <br />November 15, 1995, announcing that the Board would review the staffs recommendation, <br />consider public input and take final action regarding the proposed instream flow appropriations <br />for the endangered fish at its December 13, 1995 special meeting in Denver, Colorado. The Final <br /> <br />'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.