My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01274
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:35 PM
Creation date
10/4/2006 6:52:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2003
Description
CF Section - South Side Reservoir Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i <br /> <br />, <br />e <br /> <br />e <br /> <br />e <br /> <br />South Side Reservoir Company <br />January 22-23, 2003 <br /> <br />Agenda Item 1ge <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: South Side Reservoir Company <br /> <br />County: Larimer <br /> <br />Project Name: South Side Reservoir <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: Big Thompson River <br /> <br />,Total Project Cost: $400,000 <br /> <br />Funding Sources: CWCB and Company <br /> <br />Type of Borrower: Agricultural/Municipal <br /> <br />Median Household Income: Average <br /> <br />CWCB Loan: $360,000 <br /> <br />Blended Interest Rate: 3.1 % Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Total annual storage (fill and refill): 1,241 acre-feet <br /> <br />lihe South Side Reservoir Company operates the South Side Reservoir for delivery of irrigatio <br />. Water within a 400-acre service area. The reservoir is located in Larimer County, about 1 mil.. <br />., south west of Loveland. This project includes rehabilitation of the outlet and spillway on the dam, <br />and will allow removal of the existing storage restriction currently imposed by the State Engineer. <br />Rehabilitation work is scheduled for 2003. John Gauthiere P.E. has completed the feasibility <br />study. Proposed funding for the project consists of a $360,000 Small Project Loan and a $5,000 <br />Feasibility Study Grant from the CWCB, and the remainder from the Borrower. <br /> <br /> <br />./ <br /> <br />l- <br />, <br />, <br /> <br />"" <br />ffi _ILI'D <br /> <br />: <br /> <br />. <br /> <br />~. <br /> <br />w w ~ <br /> <br />. <br /> <br />.. <br /> <br />~ <br /> <br />.'" <br /> <br />Location Map <br /> <br />5 <br /> <br />-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.