My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01261
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:28 PM
Creation date
10/4/2006 6:52:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2003
Description
CF Section - Loan De-authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 3- <br /> <br />approved a Construction FWld project loan of $450,000 to the Company in 1998 for the <br />construction of an emergency spillway on the Riverside Reservoir Dam. The Company is <br />negotiating easements with adjacent landowners and anticipates fl11al design to commence <br />in 2004. They have requested an extension of their loan authorization (letter attached). <br />Staff recommends continuation of this loan. <br /> <br />f. Colorado Water Protective and Development Association - Water Rights Purchase - The <br />CWCB approved a Severance Tax Trust Fund Perpetual Base ACCOWlt project loan of <br />$205,000 to the Association in 2001 for the purchase of augmentation water from the <br />Bessemer Irrigating Company. The Association has experienced intemal organizational <br />constraints that have been problematic relative to the loan contracting process. The <br />Association maintains interest in the loan and has requested a continuation of the <br />authorization. Staff recommends continuation of this loan. <br /> <br />g. City of Fountain - Keeton Reservoir Rehabilitation - The CWCB approved a Construction <br />Fund project loan of $420,000 to the City in 2002 for the rehabilitation of Keeton Reservoir. <br />The City has decided to pursue fl11ancing of the project from other sources and has requested <br />de-authorization of this loan (attached letter). Staff recommends that the Board consider de- <br />authorization of this loan. <br /> <br />h. Groundwater Appropriators of the South Platte - Sedgewick Augmentation Reservoir - <br />The CWCB approved a Construction Fund project loan of $1,700,000 to GASP in 1998 <br />for the construction of a new reservoir in the lower South Platte. GASP has finalized the <br />purchase of the land required for the reservoir and is working with their design <br />consultants on the engineering plans. They have requested an extension of their loan <br />authorization (letter attached). Staff recommends continuation of this loan. <br /> <br />Recommendation <br /> <br />Staff recommends the Board approve a one-year extension or de-authorization of the loan <br />authorizations, as described above, and as shown in the attached spreadsheet. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.