My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01261
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:28 PM
Creation date
10/4/2006 6:52:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2003
Description
CF Section - Loan De-authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />MEMORANDUM <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />FROM: <br /> <br />Mike Serlet, P.E., <br />Chief, Water Supply Planning and Finance Section <br /> <br />DATE: <br /> <br />November 12, 2003 <br /> <br />SUBJECT: <br /> <br />Agenda Item 6a-h - November 19-21, 2003 Board Meeting <br />Water Supply Planning and Finance - Loan De-authorization Review <br /> <br />Introduction <br /> <br />In September 1999, the Board adopted Board Policy #1, Construction Fund and Severance Tax <br />Trust FWld Perpetual Base ACCOWlt Project Time Limits, which policy provides the following <br />direction: <br /> <br />The Colorado Water Conservation Board (CWCB) shall review the status of all Construction <br />Fund and Severance Tax Trust Fund Perpetual Base Account loan projects that do not have a <br />fully executed CWCB funding contract within three years of the project's legislative <br />authorization. These projects may be recommended for inclusion in the list of Project Loan <br />De-Authorizations in the next annual Construction Fund Bill unless the Board specifically <br />approves a time extension. <br /> <br />The Policy further outlines the basis for staff recommendations: <br />1. If the Project Sponsors have not shown diligence toward execution of a funding contract <br />within three years of their authorizing legislation, the staff will recommend to the Board <br />that the project be included in the Project Loan De-Authorization recommendation to the <br />Legislature. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.