My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01256
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:27 PM
Creation date
10/4/2006 6:52:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - New Loans - Weld County Tri-Area Conveyance Improvements - Request for Approval on Loan for a New Project from the Project Construction Loan Program
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Proiect SDonsor <br /> <br />TVDe ofProiect <br /> <br />Location <br /> <br />Date of Annlication <br /> <br />Feasibility Studies <br /> <br />Proiect Descrintion <br /> <br />Estimated Cost <br /> <br />Requested Loan <br /> <br />Previous <br />Authorization <br /> <br />SUMMARY OF PROPOSED PROJECT <br />WELD COUNTY TRI-AREA SANIT A nON DISTRICT <br />CONVEYANCE IMPROVEMENT PROJECT <br /> <br />. <br /> <br />Weld County Tri-Area Sanitation District <br /> <br />Construction of Conveyance Improvements for Runoff from Irrigated <br />and Developed lands <br /> <br />Southwestern Weld County: communities of Dacono, Frederick, and <br />Firestone <br /> <br />November 2,1998 <br /> <br />Rocky Mountain Consultants: April 1996, May 1985, September 1984 <br />TST Consultants: November 1991 <br /> <br />The project proposal is to upgrade and improve an existing runoff <br />conveyance system in southwest Weld County in the "Tri-Area". The <br />source of the runoff problems originates on the south side of the Tri-Area <br />from irrigated farmlands, and is exacerbated by the impervious developed <br />areas in the 3 communities, The project basically consists of improving <br />existing conveyance facilities such as ditches, culverts, and bridge <br />crossings, and it includes construction of a new regional detention pond <br />that will store excess runoff during periods of runoff, Many farms, <br />houses, businesses, roadways, and utilities will benefit from the runoff <br />protection that the project provides, <br /> <br />. <br /> <br />$2,409,204 <br /> <br />$1,000,000 <br /> <br />None <br /> <br />1:\boardmemlnov98\24d tri-area conveyance, doc <br /> <br />6 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.