My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 12/02/1982
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 12/02/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:26 PM
Creation date
10/4/2006 6:52:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/2/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COST OF WATER <br /> <br />The annual cost per acre-toot of a 175,000 acre-foot firm <br />water supply (for delivery at the reservoir) was estimated for <br />both the 1st and 10th year of project operation under the two <br />different financing approaches. For CWCB construction fund <br />financing, the estimated costs ot water (in inflated dollars) are <br />$48.50/ac-ft in the first year of operation and $30.80/ac-ft in <br />the 10th year. For revenue bond financing, the corresponding <br />estimated costs of water (in inflated dollars) are $211.60/ac-ft <br />in the first year and $193.40/ac-ft in the 10th year. These <br />costs reflect the projected revenue from hydropower and also <br />indicate that during the first ten years of operation, the power <br />revenues will actually decrease the unit cost of the water. In <br />constant 1982 dollars, the cost of water for the first year of <br />operation would be $23.50/ac-ft with the CWCB funding approach <br />and $102.60/ac-ft for the revenue bond approach. <br /> <br />gl <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.