My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01245
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:19 PM
Creation date
10/4/2006 6:51:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
Summary Minutes and Record of Decisions - July 26-27, 1999
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />. 13h (I). Colorado River Basin Issues -IS-Mile Reach ESA Section 7 Consultation Status <br />Report <br />Tape 3, Start/Stop: 1258 - 2980 <br />Action: Information item; no formal action taken. As the Board is going to be <br />asked in the near future to sign a recovery agreement, and it was agreed <br />that the Board should be better informed. To this end, a workshop was <br />suggested either from 8:00 tolO:OO a.m. on the first day of the September <br />meeting, or to set a separate date. There is already an August 31 Fish and <br />Wildlife meeting set, so by the end of August the agency should know <br />where the Bureau of Reclamation stands on this issue. The CWCB will <br />investigate the best date and time for all involved, and will set a meeting <br />date and time. <br /> <br />13i(m).Colorado River Basin Issues - Long Term Funding Authorization for the Colorado <br />River Recovery Program <br />Tape 1, Start/Stop: 6288 -7031 <br />Tape2, Start/Stop: 0001 - 0322 <br />Action: A motion was made by Patricia Wells that a letter be sent requesting a <br />hearing, and that Board testimony be prepared. The motion was seconded <br />by Don Schwindt and approved unanimously (9-0). The Board also <br />accepted in concept a blended rate between agriculture and municipal rates <br />and to add language to the MOU about adjustment, and directed the staff <br />to bring back a proposal on what this rate would be. The Board also <br />discussed having the flexibility to extend loan periods beyond 30 years <br />while increasing the interest rate, and to give incentives for early payment. <br />It was proposed that a loan contract would provide that iffull payment had <br />not been made by 2030, then there would be an increase in the interest <br />rate. <br /> <br />13j(aa). Colorado River Basin Issues - Black Canyon of the Gunnison National Monument <br />Reserved Rights Presentation <br />Tape 2, Start/Stop: 0000 - 0000 <br />Action: This item was deleted from the Agenda <br /> <br />Adjourn: 11:37 a.m. <br /> <br />L:\boardmem\September 99\July 99 minutes.doc <br /> <br />Minutes July 26-27, 1999 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.