Laserfiche WebLink
<br />Contract Status Report <br /> <br />. Contracts Completed During FY97-98 <br />Borrower Project <br />1 AGUA Feas Study - Aug Progra <br />2 Buffalo Mutual Irrigation Diversion Dam Rehab <br />3 Chipperfield Lane Ditch Rehab headgate & pipeli <br />4 Decker Lateral Co. SPL Ditch Lining <br />5 Durkee Ditch Co. New Headgate & Pipeline <br />6 Erie, Town of Amend#1 Parity <br />7 Farmers Independent Dit SPL Rehab ditch <br />8 Greeley & Loveland Irriga Feasibility Study <br />9 Hawkeye Lateral Ditch C Ditch Rehab <br />10 Horse Creek Water Users Purchase Aug. water <br />11 Lone Cabin Ditch & Res. Amend#2: Refinance <br />12 Lower Arkansas Feasibility Study <br />13 Morrison, Town of Raw Water Diversion & P <br />14 Pinon Mesa Ranches Diversion Structure, pipel <br />15 River Oaks on Roaring F Raw Water Irrig. System <br />16 Sanchez Ditch & Res. Co Amend#1 Increase Loan <br />17 Smith Ditch SPL rehab ditch <br />18 South Platte Lower River Amend Grant Contract <br />19 Summit Reservoir & Irrig. Rehab Res. & Irrigation S <br />. Upper Yampa WCD Refinance Stagecoach R <br />21 Ute WCD Amend#2 Refund Bonds <br />22 Weldon Valley Ditch Co. Diversion Dam Rehab <br />23 Wood Lake Mutuallrr. Co Rehab Wood Lake Da <br /> <br />, <br /> <br />, <br /> <br />Projects In Contracting Process <br /> <br />Borrower Project <br />24 Agricultural Ditch Co. Welch Ditch Pump & P <br />25 AGUA Purchase water rights <br />26 Colorado River WCD Amend#2: Final Loan <br />27 CWPDA Feas Study - Aug Prog <br />28 Excelsior Irrigating Co. Rehab ditch <br />29 Fort Lupton, City of Amend#2 <br />30 Fort Morgan, Town of Amend#2 Parity <br />31 Hudson, Town of Amend#1 <br />32 Soutrl Platte Lower River Grant <br /> <br />. <br /> <br />Loan Amount <br /> <br />25,000 <br />250,000 <br />60,000 <br />100,000 <br />120,000 <br /> <br />55,000 <br />23,400 <br />143,000 <br />825,000 <br /> <br />65,000 <br />504,000 <br />206,000 <br />16,000 <br />135,000 <br />100,000 <br />60,000 <br />600,000 <br />2,000,000 <br /> <br />$ <br /> <br />188,000 <br />188,000 <br />5,663,400 <br /> <br />Loan Amount <br />300,000 <br />650,000 <br /> <br />75,000 <br />230,000 <br /> <br />$ <br /> <br />240,000 <br />1,495,000 <br /> <br />Date <br />Completed <br />10/23/97 <br />10/23/97 <br />11/14/97 <br />1212197 <br />11/3/97 <br />1/6/98 <br />1/3/97 <br />12/8/97 <br />12/15/97 <br />12/17/97 <br />12118/97 <br />9/17/97 <br />8/26/97 <br />10/9/97 <br />8/5/97 <br />9/3/97 <br />12/3/97 <br />10/23/97 <br />9/3/97 <br />7/17/97 <br />10/23/97 <br />10/29/97 <br />12/10/97 <br /> <br />Construction Status <br />10/1/97 1/6 To Controller to sign <br />4/1/98 10/20 AGO drafting <br />211/9810/2 To Borrower to sign <br />3/1/98 9/30 To Borrower to review <br />12.'1/97 12/16 To Borrower to sign <br />211/98 11/1 drafting <br />2/1/98 12/20 To Borrower to review <br />2/1/98 11/1/ drafting <br />2/1/98 11/4 To Borrower for review <br /> <br />Prepared by Janis lIIian <br />Updated 1/21/98 <br />