My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01234
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:15 PM
Creation date
10/4/2006 6:51:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/20/2000
Description
CF Section - STTFPBA - New Loans - Weld Country Tri-Area Sanitation District - Storm Drainage Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br />~ <br />, <br /> <br />r <br /> <br />SUMMARY OF PROPOSED PROJECT <br />WELD COUNTY TRI-AREA SANITATION DISTRICT <br />STORMW ATER DETENTION FACILITY <br /> <br />- <br /> <br />Project SDonsor: Weld County Tri-Area Sanitation District <br /> <br />TVDe of Project: Municipal- drainage and flood control <br /> <br />Location: Immediately south of Frederick at the intersection of 8th Street and Main <br />Street and about Y2 mile north of Colorado Highway 52 in Weld County. <br /> <br />Date of ADDlication: October 28, 1998 and January 24, 2000 <br /> <br />Feasibilitv Study: Submitted January 2000 by the Sear-Brown Group of Fort Collins <br />(revised March 2000) <br /> <br />Project DescriDtion: The District is proposing a regional detention pond project that will <br />reduce the peak historic flows in the Tri- Town Drainageway and thereby reduce the <br />extent of flooding in the communities of Evanston, Firestone and Frederick. The pond <br />will be located on 60 acres of agricultural land immediately south of Frederick as shown <br />on the attached site map. It will have the capacity to store 146 acre-feet during the 100- <br />year storm event. Maximum inflow to the pond during the 100-year storm event will be _ <br />about 2,000 cubic feet per second (cfs) and the pond will be designed for a maximum .. <br />release rate of 567 cfs thus providing significant attenuation of the peak discharge. The <br />pond is designed to drain in about 40 hours and the project site will be used for open <br />space and recreational purposes when the pond is empty. The pond will also serve to <br />reduce the volume of pollution from storm water runoff by providing detention and <br />settling of runoff, <br /> <br />Estimated Project Cost: $2,065,478 <br /> <br />Fundinl! Reauested: $1,500,000 <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.