Laserfiche WebLink
<br />1980-81 Construction Fund <br /> <br /> Total S~te Annual Srvc. Total <br /> Proiccts Cost ost Charges d1qe. Yrs. Charges Camrents <br />1. Jackson Gulch $ 250,000 $ 125,000 $ 5,408 3% 40 $ 216,300 Irrigation <br />2. Sedgwick-Sand 3,389,020 100,000 3,656 2% 40 146,240 Flood <br /> Draws Control <br />3. Newcastle 500,000 250,000 12,630 4% 40 505,200 r>::nestic <br />4. Walden 1,100,000 450,000 22,734 4% 40 909,360 D::uestic <br />5. Granby 810,000 405,000 20,461 4% 40 818,424 t::anestic <br />6. Fruitland M2:sa 3,848,804 1,924,402 83,250 3% 40 3,329,985 Irrigation <br /> WCD 1) not rec'rn::1, <br />7. I31~ rtiver WD 2,400,000 1,200,000 60,624 4% 40 2,424,960 D::m=stic <br />8. Town of Frota 1,600,000 800,000 40,416 4% 40 1,616,640 Dorrestic <br />9. Town of Parachute 400,000 200,000 10,104 4% 40 404,160 Dorrestic <br />10. Town of Wellington 2,280,000 1,140,000 57,593 4% 4U 2,303,712 D:>rrestic <br />II. City of Trinidad 931,300 465,000 26,891 4% 30 806,730 Dorrestic <br />12. ':rov.n of Erie 627,060 313,530 11,463 2% 40 458,506 Flood <br /> Control <br />13. Kern Reservoir 200,000 100,000 4,326 3% 40 173,040 Irrigation <br />14. Orchard M2sa WCD 2,600,000 1,300,000 56,238 3% 40 2,249,520 Irrigation <br />15. Oman City 420,000 22.0,000 10,609 4% 40 424,368 D::rrestic <br />16. Fa.rners Irrigation 217,300 -54,325 3,652 3% 20 73,034 Irrigation <br /> Ditch & Reservoir Co. <br /> TOrAIS $17 ,724,680 $7,112,855 $346,805 $13,530,194 <br /> % Total <br /> TOrAL P= SI'ATE ())SI': (a) Flood Control $ 413,530 6 <br /> (b) Irrigation 1,579,325 22 <br /> (e) J:Jarestic 5,120,000 72 <br /> $7,112,855 100 <br /> <br />1) Entity cannot repay total cost. Project not recrnrrended by staff. Cost estirrat.es <br />are not included in totals or in the statistical evaluation aJ:ove. <br />