|
<br />1980-81 Construction Fund
<br />
<br /> Total S~te Annual Srvc. Total
<br /> Proiccts Cost ost Charges d1qe. Yrs. Charges Camrents
<br />1. Jackson Gulch $ 250,000 $ 125,000 $ 5,408 3% 40 $ 216,300 Irrigation
<br />2. Sedgwick-Sand 3,389,020 100,000 3,656 2% 40 146,240 Flood
<br /> Draws Control
<br />3. Newcastle 500,000 250,000 12,630 4% 40 505,200 r>::nestic
<br />4. Walden 1,100,000 450,000 22,734 4% 40 909,360 D::uestic
<br />5. Granby 810,000 405,000 20,461 4% 40 818,424 t::anestic
<br />6. Fruitland M2:sa 3,848,804 1,924,402 83,250 3% 40 3,329,985 Irrigation
<br /> WCD 1) not rec'rn::1,
<br />7. I31~ rtiver WD 2,400,000 1,200,000 60,624 4% 40 2,424,960 D::m=stic
<br />8. Town of Frota 1,600,000 800,000 40,416 4% 40 1,616,640 Dorrestic
<br />9. Town of Parachute 400,000 200,000 10,104 4% 40 404,160 Dorrestic
<br />10. Town of Wellington 2,280,000 1,140,000 57,593 4% 4U 2,303,712 D:>rrestic
<br />II. City of Trinidad 931,300 465,000 26,891 4% 30 806,730 Dorrestic
<br />12. ':rov.n of Erie 627,060 313,530 11,463 2% 40 458,506 Flood
<br /> Control
<br />13. Kern Reservoir 200,000 100,000 4,326 3% 40 173,040 Irrigation
<br />14. Orchard M2sa WCD 2,600,000 1,300,000 56,238 3% 40 2,249,520 Irrigation
<br />15. Oman City 420,000 22.0,000 10,609 4% 40 424,368 D::rrestic
<br />16. Fa.rners Irrigation 217,300 -54,325 3,652 3% 20 73,034 Irrigation
<br /> Ditch & Reservoir Co.
<br /> TOrAIS $17 ,724,680 $7,112,855 $346,805 $13,530,194
<br /> % Total
<br /> TOrAL P= SI'ATE ())SI': (a) Flood Control $ 413,530 6
<br /> (b) Irrigation 1,579,325 22
<br /> (e) J:Jarestic 5,120,000 72
<br /> $7,112,855 100
<br />
<br />1) Entity cannot repay total cost. Project not recrnrrended by staff. Cost estirrat.es
<br />are not included in totals or in the statistical evaluation aJ:ove.
<br />
|