My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01216
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:07 PM
Creation date
10/4/2006 6:51:43 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
Summary Minutes and Record of Decisions - July 13-14, 1998
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />26c. Colorado River Basin Issues - San Juan/San Miguel-Dolores Director's Report <br />Tape 3, Start/Stop: 0000 - 0000 tape failure <br />Action: This was an informational item; no action taken. <br /> <br />26d. Colorado River Basin Issues - Yampa-White Director's Report <br />Tape 3, Start/Stop: 0000 - 0000 tape failure <br />Action: This was an informational item; no action taken. <br /> <br />26e. Colorado River Basin Issues - Colorado River Commissioner's Report <br />Tape 3, Start/Stop: 0000 -:- 0000 <br />Action: This item was not addressed due to the Commissioner's absence, although a <br />memorandum to Board members was distributed in place of the <br />Commissioner's report. <br /> <br />26f. Colorado River Basin Issues - Aspinall Operations -1988 Planned Spring Peak <br />Tape 3, Start/Stop: 0100 - 0140 <br />Action: This was an informational item; no action taken, <br /> <br />26g. Colorado River Basin Issues - Paradox Valley Unit Augmentation Operations <br />Tape 3, Start/Stop: 0140 - 0493 <br />Action: This was an informational item; no action taken. <br /> <br />26h. Colorado River Basin Issues ~ Rio Blanco Habitat Restoration Project - Status <br />Report <br />Tape 3, Start/Stop: 0835 - 0897 <br />Action: This was an informational item; no action taken. <br /> <br />26i. <br /> <br />Colorado River Basin Issues - 15 Mile Reach ESA Section 7 Consultation <br />Tape 3, Start/Stop: 0902- 2584 <br />Action: This was an informational item; no formal action taken, although the Board <br />directed CWCB Acting Director Peter Evans to facilitate meetings between <br />the Bureau and Grand Valley Water Users concerning the HOP surplus <br />water delivery contract by the next Board Meeting and provide a report at <br />that time. <br /> <br />26j. <br /> <br />Colorado River Basin Issues -IS-Mile Reach Recovery Water Rights - Cases Number <br />S-9Scw296 and 297 <br />Tape 3, Start/Stop: 2596 - 4626 <br />Action: This was an informational item; no action taken. <br /> <br />Minutes July 13-14, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.