My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01206
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:04 PM
Creation date
10/4/2006 6:51:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - General and Financial Matters - Reconnaissance and Feasibility Study Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />co,oraAater Conservation Board . 14-Sep-98 . <br />Water Project Construction Loan Program <br />Feasibility Study Status Report <br /> CWCB <br /> Feas. Study <br /> Contract Date Date Percent <br />AppUcantlBorrower &oJect =~ Am<>unl Enalneer ~ Star! Eru1 C<>mpL <br />Feasibility StudIes Completed In FY 1997-98 <br />AGUA Augmentation Plan Feasibility Study 7 counties 25,000 Rocky Mountain Consultants WEG 01~Mar-97 30.Jul-97 100% <br />Appleton ML 350 Ditch Co.. Inc. Rehabilitate Ditch with SCS/ASCS Mesa 0 ewes Staff MGS Q1.Apr.96 25-Feb-98 100% <br />Chipperfield Lane Ditch Co. Headgate and Pipeline Gartield 0 ewes Staff with NRCS JVS 01-Jun-97 15-Jul.97 100% <br />City of Fort Morgan Southem Water Supply Project Morgan 0 GronninglMontgomery Watso WEG 15-Jan-97 100% <br />City of Loveland Greenridge Glade Reservoir Enlargement Larimer 50.000 Woodward-Clyde WEG 01.Jan-85 31-Qct-97 100% <br />Cotton Creek Ditch Co: Pipeline Saguache 0 ewes Staff with NRCS JVS 01-Jun-97 15-Jul-97 100% <br />Decker Lateral Co. Decker Lateral Rehabilitation Weld 0 CWCB Staff JVS 31-Jul-97 . 15-Sep-97 100% <br />Duri<ee Ditch Co. Headgate Rehab. and Pipeline Delta 0 CWCB Staff JVS 15-Sep-97 14-Nov-97 100% <br />Exce!sior Irrigating Co. Excelsior Ditch Rehabiliotation Pueblo 0 KLH Engineers JVS 15-Sep-96 15-Apr-98 100% <br />Farmers Independent Ditch Ditch Rehabilitation' Weld 0 CWCB Staff with NRCS JVS 15-Sep-97 14-Nov-97 100% <br />Farmers Pawnee Canal Diversion Structure Rehab. Logan 2,928 Farnsworth & Polk JVS 01-Feb-98 01-Apr-98 100% <br />Greeley and Loveland Irrig. Co. Storage and Disl. System Rehab. Weld 10,000 ECI WEG 21-Jan-97 21-Nov-97 100% <br />Hawkeye Lateral Ditch Co. Headgate Rehab. and Pipeline Mesa 0 CWCS Staff JVS 12-Dec-97 18-Dec-97 100% <br />Morgan County Quality Water District Southern Water Supply Project Morgan 0 George Underwood, P.E. WEG 01-Sep-97 15-Sep-97 100% <br />River Oaks of the Roaring Fori< POA Raw Water Irrigation System Eagle 0 CWCB Staff JVS 15-May-97 100% <br />South Platte Lower River Group Lower South Platte Water Resources Investigation several 75,000 NCWCD Staff JVS 3Q-Jut-96 01-Jul-98 100% <br />Town of Georgetown Water Rights Purchase Feasibility Clear Creek 0 Mclaughlin Water Engineers JVS 15-Nov-95 15-Jul-97 100% <br />Town of Palisade Replace Cottonwood Creek Pipeline Mesa 9,500 WestWater/Hydrosphere WEG 01-Sep-95 21-Nov-97 100% <br />Vallecilo Water Co. Treated Water Distribution System La Plata 0 Harris Water Engineering WEG 01-Sep-97 21-Sep-97 100% <br />Weldon Valley Ditch Co. Diversion Structure Rehabilitation Weld 0 CWCB Staff JVS 01-Jul-97 3Q-Jul-97 100% <br />Wood Lake Mutual Water & Img. Co. Woods lake Dam Rehabilitation Weld 3,000 Smith Geotechnical JVS 20-Nov-96 15-Jan-97 100% <br />Ute Water Conservancy District Plateau Creek Pipeline EIS Mesa Camp Dresser & McKee WEG 01-Dec-94 15-May-98 100% <br />Feasibility Studies Completed in FY 1998-99 <br />Rodney Prelsser Purchase Augmentation Water Lincoln 0 HRS Water Consultants JVS 01-Feb-98 02-Sep-98 100% <br /> <br />FEASIBIL.WK4 <br /> <br />Page 1 <br /> <br />09/14/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.