Laserfiche WebLink
<br /> Payment Total <br /> Project Name Board Cost Period Iyrs) Payment <br />City of Trinidad $ 465,000 30 $ 806,730 <br />Blue River Water System l,200,000 40 2,424,960 <br />Town of Wellington 1,140,000 40 2,303,712 <br />Town of Granby 405,000 40 818,424 <br />Town of Fruita 800,000 40 1,6l6,640 <br />Town of Erie 313,530 40 458,506 <br /> Total $6,921,530 $13,162,015 <br /> <br />(b) The Colorado water conservation board may expend on <br />each project specified in paragraph (a), from such moneys as are <br /> <br />or may hereafter become available to the Colorado water conservation <br /> <br />board construction fund, the amounts of money listed in paragraph <br />(a) plus or minus such amounts, if any, as may be justified by <br /> <br />reason of ordinary fluctuations in construction costs, as indicated <br /> <br />by the engineering cost indices applicable to the types of con- <br /> <br />struction involved for such projects, or as may be justified by <br /> <br />reason of changes made in the plans and specifications of the <br /> <br />project when those changes are required by finalized engineering <br /> <br />drawings and specifications or by federal or state requirements. <br /> <br />(c) All municipal and domestic water supply projects <br /> <br /> <br />specified in paragraph (a) shall include the installation of <br /> <br />water meters on all service connections not presently metered. <br /> <br />(d) The sponsor of a project specified in paragraph (a) <br /> <br />may not give notice of award of, nor notice to proceed with, <br /> <br /> <br />construction, nor in any manner incur costs for or initiate the <br /> <br />-2- <br />