My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01170
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:46 PM
Creation date
10/4/2006 6:51:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2003
Description
Flood Section - South Platte Downstream Channel Improvement Project - City of Littleton, Colorado Easement Request
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866.4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br />FROM: <br />DATE: <br />SUBJECT: <br /> <br />Colorado Water Conservation Board Members <br />Lany Lang, P.E., Chief, Flood Protection Section <br />November 6, 2003 <br />Agenda Item 28, November 19-21, 2003 Board Meeting-- <br />Easement Request for Semper Development <br />(South Platte River in Denver) <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Introduction <br />At the November 6-7, 1995 Board Meeting, approval was given by the Board to grant requests for <br />easements in CWCB's right-of-way along the Chatfield Downstream Channel Improvement Project <br />(Project) on a case-by-case basis. In addition, at the November 21, 2001 Board Meeting, the Board <br />adopted the "Easement Guidelines for the Chatfield Downstream Channel Improvement Project" dated <br />November 2001. The Staff has received a request from City of Littleton and Semper Development, <br />MUl11eapolis, Minnesota. The Board staff has not received a complete request and application. <br /> <br />Discussion <br /> <br />The City of Littleton and Semper Development request is for a trail and bike bath c0ll11ection of the <br />South Platte Trail system. <br /> <br />The Semper Development application is ulcomplete at this date and the applicant recognizes that they <br />cannot have an acceptable easement application to staff by the CWCB November 2003 Meetulg. <br /> <br />Recommendation <br /> <br />The staff recommends that the City of Littleton and Semper Development easement request be <br />referred to a future CWCB meetulg. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.