My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01159
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:36 PM
Creation date
10/4/2006 6:50:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
CF Section - Terrace Irrigation Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br /> <br />\ <br /> <br />Terrace Irrigation Company <br />March 17, 2004 <br /> <br />Agenda Item 25e. <br /> <br />FEASmILlTY STUDIES <br />Davis Engineering Service, Alamosa, Colorado, has completed a feasibility study for the project. <br />The completed study addresses water rights, alternative analysis, and provides a financial summary <br />for the proj ect. <br /> <br />. <br /> <br />TERRACE IRRIGATION COMPANY <br />The TIC is a mutual ditch company and a non-profit corporation registered in the State of <br />Colorado. There are 27 shareholders and 831- 7/8 shares of stock. The TIC has the power to set <br />annual assessments to be paid by the shareholders, the power to cut off water deliveries to <br />shareholders that fail to pay their assessments, and the power to offer stock for sale to pay back <br />assessments. <br /> <br />WATER RIGHTS <br />The source of water for the Company is largely storage rights in Terrace Reservoir that are <br />released into the Alamosa River and diverted to shareholders by the Terrace and Alamosa Creek <br />Canals. Water rights have priority numbers ranging from 1 to 112, with an average annual <br />diversion from 1992-2002 of IS,339 acre-feet <br /> <br />PROJECT DESCRIPTION <br />The purpose ofthis project is to address damage that has occurred to the reservoir's outlet works. <br /> <br />Two alternatives were evaluated, which are described as follows: <br /> <br />. <br /> <br />Alternative No. I - No-action taken. <br /> <br />Alternative No.2 - Construct cofferdam, remove and replace existing trash rack, remove debris <br />and sediment within the outlet pipe, repair existing 48-inch double leaf gate valve in the west <br />outlet tunnel, and clean downstream ring-jet valve. <br /> <br />Estimated Cost = $270,000 <br /> <br />ALTERNATIVE ANALYSIS <br />Alternative No. I was not acceptable since it would no longer allow TIC to store water in the <br />facility. Without an operable outlet works the State Engineer's Office would require the dam <br />breached, which would be at a greater expense then to repair the facility, and the existing storage <br />rights would be lost. <br /> <br />Alternative No.2 was selected since it will allow TIC to continue operating the facility, and <br />therefore, provide irrigation flows to its shareholders. <br /> <br />The implementation schedule calls for completion of financing arrangements in April/May 2004. <br />Given the urgency of the repairs, construction commenced in January of 2004 and is anticipated <br />to be completed by April of 2004. <br /> <br />. <br /> <br />FINANCIAL ANALYSIS <br />The total cost of the project is estimated at $270,000. Staff is recommending a Small Project <br />Loan from the Severance Tax Trust Fund Perpetual Base Account in the amount of $243,000 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.