My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01142
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:31 PM
Creation date
10/4/2006 6:50:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
Summary Minutes and Record of Decisions - November 16-17, 2004
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Action: <br /> <br />A motion was made by Don Schwindt with a second by Eric Wilkinson to approve staff <br />recommendation for a loan not to exceed $129,785 ($128,500 for project costs and <br />$1,285 for the 1% Loan Service Fee) to the Beaver Reservoir Company for engineering <br />and construction costs associated with the Beaver Reservoir Liner Protection & Valve <br />Replacement Project, from the Severance Tax Trust Fund Perpetual Base Account. The <br />terms shall be based on the current agricultural rate of2.5% per annum for a 30-year <br />term. Final approval of the loan shall be conditioned upon all standard contracting <br />provisions of the CWCB Loan Program. Security for the loan shall be collateral in <br />compliance with CWCB Loan Policy #5. Motion was approved 8-0. Russell George <br />and Bob Burr were not present. <br /> <br />. <br /> <br />b. Buffalo Farms Water Development, LLC - Groundwater Recharge Project <br />Tape 2, Track 1 1:20:36-1:47:00 <br /> <br />A motion was made by Tom Sharp with a second by Eric Wilkinson to approve staff <br />recommendation for a loan not to exceed $195,435 ($193,500 for project costs and <br />$1935 for the 1 % Loan Service Fee in accordance with CWCB Loan Policy #16), to <br />Buffalo Farms Water Development, LLC, from the Severance Tax Trust Fund Perpetual <br />Base Account, to enhance and expand an existing groundwater recharge project for well <br />augmentation, and to pay expenses already incurred. The recommended terms of the <br />loan are 20 years at 2.25% per annum. Security for the loan will be a first lien on real <br />estate with a total value equal to or greater than the CWCB loan amount, including a 14 <br />% interest in the project being financed to cover the augmentation requirements of the <br />well being provided with the collateral land. Staff further recommends that final <br />approval of the loan be conditioned upon all other standard contracting provisions of the <br />CWCB. Also, the principals will be required to be personally and jointly and severally <br />guarantee the loan. Motion was approved 8-0. Russell George and Bob Burr were not <br />present. . <br /> <br />c. Upper Arkansas Water Conservancy District - North Fork Reservoir Rehabilitation and <br />Expansion Project <br />Tape 2, Track 1 1 :47:00 -2:03:00 <br />Action: A motion was made by Harold Miskel with a second by Eric Wilkinson to approve staff <br />recommendation for a loan not to exceed $3,009,800 ($2,980,000 for project costs and <br />$29,800 for the 1% Loan Service Fee) to the Upper Arkansas Water Conservancy <br />District acting by and through the District's Water Activity Enterprise Fund for <br />engineering and construction costs associated with the North Fork Reservoir <br />Rehabilitation and Expansion Project, from the Severance Tax Trust Fund Perpetual <br />Base Account. The terms shall be based on a blended rate of 3.0% per annum for a 30- <br />year term. Final approval of the loan shall be conditioned upon all standard contracting <br />provisions of the CWCB Loan Program. Security for the loan shall be collateral in <br />compliance with CWCB Loan Policy #5. Motion was approved 8-0. Russell George <br />and Bob Burr were not present. <br /> <br />Action: <br /> <br />d. Well Augmentation Sub-District of the Central Colorado Water Conservancy District - Water <br />Rights Purchase and Gravel Pit Storage <br />Tape 2, Track 1 2:03:00 - 2:25:32 <br />Action: A motion was made by Eric Wilkinson with a second by Barbara Biggs to approve staff <br />recommendation for a loan not to exceed $20,200,000 ($20,000,000 for project costs <br />and $200,000 for the 1% Loan Service Fee in accordance with CWCB Loan Policy <br />#16), to the Well Augmentation Subdistrict of the Central Colorado Water Conservancy <br />District, from the Severance Tax Trust Fund Perpetual Base Account, to purchase water . <br />rights and to construct lined gravel pit storage. The recommended terms of the loan are <br />30 years at 2.50% per annum. Security for the loan will be a pledge of general revenues <br />received from property taxes, as authorized by the Well Augmentation Subdistrict's <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.