Laserfiche WebLink
<br />, <br /> <br />t <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />13a. Water Project Construetion Loan Program - Small Project Loan Account - Farmers <br />Pawnee Canal Co.- Diversion Structure Rehabilitation <br />Tape 2, Start/Stop: 1816 - 1934 <br />Action:A motion was made by David Smith to accept the staff recommendation that a <br />construction fund loan from the Small Project Account be approved for the <br />Farmers Pawnee Canal Company to rehabilitate their diversion dam and <br />headgate on the South Platte River, in the maximum amount of $29,000, not <br />to exceed 75% of the costs of the project, that the financing terms for this be <br />at an annual percentage rate of 3.5% for a duration of 10 years, and the loan <br />approval be contingent upon completion of the Feasibility Study, and upon <br />all standard contacting provisions of the CWCB, and that security for the <br />loan by a security interest in the stream of income derived by the Company <br />from assessments, and one payment in a certificate of deposit account to be <br />held by the State Treasurer. The motion was seconded by Eric Kuhn and <br />approved unanimously (7-0). <br /> <br />13b. Water Project Construction Loan Program - Small Project Loan Aecount - Boulder <br />and Lefthand Ditch Co. - Twin Lakes Reservoir Outlet Rehabilitation. <br />Tape 2, Start/Stop: 1934 - 2067 <br />Action: A motion was made by Eric Kuhn Smith to accept the staff recommendation <br />that a construction fund loan from the Small Project Account be approved <br />for the Boulder and Lefthand Ditch Co. to rehabilitate the inlet and outlet <br />structures on the Twin Lakes Reservoir and drop structures on the ditch, in <br />the maximum amount of $50,000, not to exceed 75% of the costs of the <br />project, that the financing terms for this be at an annual percentage rate of <br />3.75% for a duration of 15 years, and the loan approval be contingent upon <br />completion of the Feasibility Study, and upon all standard contacting <br />provisions of the CWCB, and that security for the loan by a security interest <br />in the stream of income derived by the Company from assessments, and one <br />payment in a certificate of deposit account to be held by the State Treasurer. <br />The motion was seconded by David Smith and approved unanimollSly (7-0). <br /> <br />13c. <br /> <br />Water Project Construction Loan Program - Small Project Loan Account - Westeru <br />Mutual Ditch Co. - Diver Diversion Repair <br />Tape 2, Start/Stop: 0000 - 0000 <br />Action: This item was deleted from the agenda. <br /> <br />14a. <br /> <br />Water Project Construction Loan Program - Native Aquatic Species Facility - <br />Proposed MOD with DOW <br />Tape 2, Start/Stop: 1400 - 1816 <br />Action: A motion was made by Eric Kuhn that the Board authorize the Acting <br />Director to sign the draft MOD at such time as all feasibility investigations <br />by CWCB and CDOW staffs have been completed and final issues <br /> <br />Minutes March 10-11, 1998 <br />