My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01133
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:29 PM
Creation date
10/4/2006 6:50:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
Summary Minutes and Record of Decisions - March 10-11, 1998
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br />, , <br /> <br />Agenda Item 22. <br />March 10, 1998 <br /> <br />. <br />. <br /> <br />Page 4 <br /> <br />(Updated April 14, 1998) <br /> <br />. <br /> <br />Action taken bv the CWCB March 10. 1998: <br /> <br />. The ewCB specified that the staff memorandum dated February 27, 1998 and <br />presented at the March 16, 1998 meeting is officially designated as a "draft". The <br />CWCB further specified that the memorandum be revised into fmal form with input <br />from, and to the satisfaction of, the Attorney General's Office and the State Engineer's <br />Office, (This memorandwn, designated as "Updated April 14, 1998", incorporates all <br />required revisions, and represents the official record for this agenda item.) <br /> <br />. The CWCB recommended a Construction Fund Authorization of up to 100% of the <br />estimated cost of $1,700,000, for Groundwater Appropriators of the South Platte <br />(GASP), to construct the Sedgwick Augmentation Reservoir and related structures. <br /> <br />. The ewCB approved fmancing terms for this Construction Fund Authorization with an <br />effective return of 3% per annum for 40 years to the Board. The loan may be structured <br />with a lower payment for the first 10 years, provided that the total return to the Board <br />over the life of the loan is equivalent to (i.e. has the same net present value as) a 3% per <br />annum loan for 40 years. <br /> <br />. As a condition of the loan, GASP must agree to work with the State Engineer's Office to <br />establish a process for developing a reservoir operational plan, in colijunction withe <br />SPLRG (The South Platte Lower River Group.) The plan would be subject to the <br />approval and oversight of the State Engineer's Office. GASP would operate the reservoir <br />for 5 years and will attempt to quantify any benefits to the State and to the recovery <br />program, To the extent those benefits can be quantified, the~ewcB may coilsider <br />turning an equivalent portion of the loan into. a grant. '. . <br /> <br />. <br /> <br />. The ewCB approved staff recommendations numbers 3. and 4. as written. <br /> <br />- <br />D:\IlIJCklcsGASPt9lmmD <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.