My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01118
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:20 PM
Creation date
10/4/2006 6:50:17 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2006
Description
WSP Section- Animas-La Plata Project Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of N aturaJ Resources <br />13 13 SnnmAll SUM. Room 72] <br />~yn, Colorado 80203 <br />Phone: (JOJ)lJ66.>w1 <br />FAX (303) 8664474 <br />www cwcb St.l~ co U$ <br /> <br />.,0 'ON". <br />~">M""o <br />< . . <br />. . <br />o Il <br />~ . ~ <br />. , <br />. , <br />'J"J' <br /> <br />;\IEMORAl'iDUi\I <br /> <br />BIUOweru <br />Gov~or <br /> <br />Rus~lI~rge <br />ExC'o.lllvC'Diffctor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board ~1embers <br /> <br />Randy Seaholm ~ <br />Chief, Water Supply Protect <br /> <br />Rod Kuhand1 <br />eweB Dlrt'Ctor <br /> <br />FROM: <br /> <br />Rick 8ro.....n <br />Acnng Deputy D~or <br /> <br />DATE: <br /> <br />March 13. 2006 <br /> <br />REF: <br /> <br />Agenda Item 8, March 21.22, 2006 Board Meeting: 'Vater Suppl)' Protection <br />- Animas-La Plata Project (ALP) - Section 207 of P.L 108-447 <br /> <br />8acke.round: <br />Construction of the ALP is a key piece of the Colorado Ute Indian Water Rights Settlement and <br />will provide water to those listed in the table below. Shortly after the start of construction. the <br />U.S. Bureau of Reclamation (Reclamation) issued a report detailing the estimated construction <br />costs of the ALP and describing the reasons for a SI63 million increase o\'er the previous cost <br />estimate for constructing the ALP. The revised total cost estimate for ALP was S500 million in <br />January 2004 and that cost will escalate for inflation until construction is completed, estimated in <br />2008. The recent interim total allocable project cost estimate is $52 I ,033,475. The reservoir is <br />expected to fill by 2011. <br /> <br />The report describes the factors contributing to the increased costs and those factors were <br />discussed with the Board in January 2004. StafTwill provide Board members copies of that <br />should they desire. Following the issuance of the revised cost estimate report, the project <br />sponsors sought congressionallegislalion to limit the impact of the cost increase on their <br />rcpa)ment contracts, which legislation was passed in Section 207 ofP.L. 108-447. <br /> <br />The ALP water allocations are as follows: <br /> <br />Item AlPWCD SJWC lCD Colorado Nava;o SUIT UMUT Subtotal <br />Water S~nlv tan 5,200 20,800 1.560 10,440 4,680 33,519 33.519 109,718 <br />Water De~lelion (an 2.600 10,400 780 5,230 2,340 16,525 16,565 54.440 <br />Reservoir Sunn/v 2,919 3.025 1,560 10,440 869 38.109 38,108 95.030 <br />Percentane 307% 3.18% 1,64% 10.99% 0.91% 40.10% 40.10% 100.00% <br /> <br />Discussion: <br />As you can see in the attached memo, Section 207 ofP.L. 108.447 allows the Secretary of <br />Interior to forgive the S 163 million cost increase and the associated inflationary cost increases <br /> <br />flood PrDlC'l;t10D . W'ICT Supply Plannmg and Finance. Strc'.m and L.l.ke PrOltrnOD <br />W'ICT Supply PnxC'CtJOn. Con5CT'V;tOOn and Droughl Pl4nrung <br />
The URL can be used to link to this page
Your browser does not support the video tag.