My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01105
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:07 PM
Creation date
10/4/2006 6:49:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
ISF Section - Instream Flow Appropriations - Middle Fork Escalante Creek
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Staff's Instream Flow Recommendation <br />Staff recommends the Board form its intent to appropriate on the following stream reach: <br /> <br />Seq ment: Headwaters to East Fork Escalante Creek <br /> <br />Upper Terminus: Headwaters <br />(Latitude 380 30' 12"N) (Longitude 108034' 04"W) <br />UTM =42 67 689N 13 I 88 865E <br />NE NW S20 T49N R15W NMPM <br />1822' East of West Section Line 138' South of North Section Line <br /> <br />Lower Terminus: East Fork Escalante Creek <br />(Latitude 380 34' 55" N) (Longitude 108024' 21"W) <br />UTM =42 75 896N 13 203 305E <br />NW SW S23 T50N R14W NMPM <br />866' East of West Section Line 2069' North of South Section Line <br /> <br />Counties: Mesa <br />Length: 11.4 miles <br />USGS Quad(s): Snipe Mt.and Kelso Point <br />Flow Recommendation: 3.1 cfs (Aprill e' - June 30th) <br />1.6 cfs (July Ie' -October 31 e') <br />1.25 cfs (November I - March 31) <br /> <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.