My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01104
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:05 PM
Creation date
10/4/2006 6:49:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CF Section - Loan De-Authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JOH:\' I'EROL'L1S & SO:\'S I'ART:\'ERSHII' <br />.\IARTI:\' CUl.l. RESERVOIR REIIABII.IT A TlO:\' <br /> <br />- <br /> <br /> <br />Proiect Description <br /> <br />This 5300,000 project involved the rehabilitation of ~tartin Cull Reservoir, located <br />approximately 28 mile north of Craig. Colorado. In the summer of2000 a slide occurred along the <br />upstream face of the dam embankment. which caused the State Engineer's Office to impose a zero <br />storage restriction on the facility. Improvements to the reservoir included reconstructing the <br />upstream face of the embankment. bringing the downstream face of the embankment to a more <br />stable configuration and replacing the existing outlet structure and pipe with a new structure. <br /> <br />Proiect Data <br /> <br />Sponsor: John Peroulis & Sons Partnership Count).': :v1offat 'Vater Source: Fortification Creek <br /> <br />Terms of Loan: S250.000@ 2.75% for 3D-years Suhstantial Completion Date: ~OV. 1,2002 <br /> <br />Desi~n Engineer: :\'orthwest Colorado Consultants, Inc. - Steamboat Springs, CO. <br /> <br />Conslruction Conlractor: l\ative Construction. Inc. - Steamboat Springs, CO. <br /> <br />Design Elements: <br /> <br />Precast Gate Chanlber w1l2" Sluice Gate <br />500 L.F. of 12" PVC Outlet Pipe <br />70,000 Co)'. Excavation and Backfill <br /> <br />Annual Volume of \Vater Oelinred by the Project: 330 acre-ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.