Laserfiche WebLink
<br />JOH:\' I'EROL'L1S & SO:\'S I'ART:\'ERSHII' <br />.\IARTI:\' CUl.l. RESERVOIR REIIABII.IT A TlO:\' <br /> <br />- <br /> <br /> <br />Proiect Description <br /> <br />This 5300,000 project involved the rehabilitation of ~tartin Cull Reservoir, located <br />approximately 28 mile north of Craig. Colorado. In the summer of2000 a slide occurred along the <br />upstream face of the dam embankment. which caused the State Engineer's Office to impose a zero <br />storage restriction on the facility. Improvements to the reservoir included reconstructing the <br />upstream face of the embankment. bringing the downstream face of the embankment to a more <br />stable configuration and replacing the existing outlet structure and pipe with a new structure. <br /> <br />Proiect Data <br /> <br />Sponsor: John Peroulis & Sons Partnership Count).': :v1offat 'Vater Source: Fortification Creek <br /> <br />Terms of Loan: S250.000@ 2.75% for 3D-years Suhstantial Completion Date: ~OV. 1,2002 <br /> <br />Desi~n Engineer: :\'orthwest Colorado Consultants, Inc. - Steamboat Springs, CO. <br /> <br />Conslruction Conlractor: l\ative Construction. Inc. - Steamboat Springs, CO. <br /> <br />Design Elements: <br /> <br />Precast Gate Chanlber w1l2" Sluice Gate <br />500 L.F. of 12" PVC Outlet Pipe <br />70,000 Co)'. Excavation and Backfill <br /> <br />Annual Volume of \Vater Oelinred by the Project: 330 acre-ft. <br />