Laserfiche WebLink
<br />SB 96-153 <br /> <br />SB 96-153 <br /> <br />SB 97-008 <br /> <br />SB 97-008 <br /> <br />SB 97-008: <br /> <br />South Platte River Multi-Objective Management Plan <br />".., to develop a multi-objective management plan to mitigate fillureflood losses and <br />improve irrigation supply within the State of Colorado, The plan will identify and <br />evaluate potential solutions to address channel conveyance, sediment deposit, <br />vegetative management, reservoir operations, and a self-help program fin' land <br />owners. " <br /> <br />. <br /> <br />Roaring Fork and Fryiug Pan Rivers Multi-Objective Management Plan <br />".., to identify areas vulnerable to flood losses and develop a coordinated muiti- <br />objective management plan to mitigate fillure flood losses and improve irrigation <br />supply, .. <br /> <br />Continuation of the Roaring Fork River Multi-Objective Mauagement Plan <br />"to develop an overall master plan to manage streambank erosion, channel migration, <br />sediment, debris, and minimulll stream flows for the Aspen reach; to fully implement an <br />existing master plan to manage channel stability, erasion, debris, and protection of <br />irrigation facilities for the Carbondale reach; to develop a plan to manage public <br />access for recreation and stream beautification for the Glenwood Springs reach; to <br />develop a plan to manage flshing, Ruedi reservoir release rates, flooding, and stream <br />stability for the Fryingpan river; to develop a plan to manage erosion, sedimentation, <br />flooding, and trans basin diversions for the upper tributaries; and to contract for <br />services ," for advanced flood mitigation measures", .. <br /> <br />Arkansas River Multi-Objective Management Plan <br />".., to continue development of a multi-objective management plan for the Arkansas <br />River for the stream reach extendingfrom Pueblo to the Colorado-Kansas state line, .. <br /> <br />Statewide River Rehabilitation and Floodplain Management Plan <br />"to contract for services to conduct a statewide inventory of river channel <br />rehabilitation andfloodplain management needs (in Colorado). .. <br /> <br />. <br /> <br />SB 98-1189 Arkansas River Multi-Objective Management Plan (continuation) <br />"to continue development of the South Platte River multi-objective management plan, .. <br /> <br />JIB 00-1419 Alamosa River Watershed Project <br />"to participate in the design and construction of portions of the Alamosa river <br />watershed project.., The purposes.., are to stabilize river bank erosion and improve <br />riparian habitat along the Alamosa river, .. <br /> <br />SB 01-157 Alamosa River Watershed Restoration Project <br />To continue .., in the construe/ion of a stream bank stabilization and riparian habitat <br />improvement project, .. <br /> <br />JIB 02-1152 Fountain Creek Watershed Project <br />"to participate in a watershed study along Fountain Creek in the vicinity of Colorado <br />Springs and adjacent areas of EI Paso, Pueblo, and Teller Counties, Colorado, The <br />purposes of the study are to define specific flood mitigation measures to lessen flood <br />severity and reduce filture flood and erosion damages along Fountain Creek. .. <br /> <br />. <br /> <br />2 <br />