My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 01/14/1985
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 01/14/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:48 PM
Creation date
10/4/2006 6:49:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/14/1985
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />a. Chdcfielg.:n tile original reservoir design scu'Jies, chree hydrologic <br /> <br />conditions I.vl=re evaluated for this project. TivO conditions assumed rare COfn- <br /> <br />binations of rainfall runoff and mountain sno'..mJelt. Tne third condition <br /> <br />assun~j a standard project flood on top of 3 high starting pool. It was con- <br />cluded from these early 3tudies that 215,000 acre-feet flood storilge stJould be <br /> <br />the design flood control capacity in Chatfield. As a result of the reevalua- <br /> <br />tion by using the degree of protection discussed at the outset, the standard <br /> <br />project rainfall flood became the most critical event requiring a total flood <br /> <br />storage capacity of 182,000 3cre-feet. <br /> <br />b. B<2ar Creek. Th,e original reservoir design flood for "lp.ar Creek.. \./as <br /> <br />based on controlling the standard project rainfall flood event. Tnis required <br /> <br />a storage capacity of 26,300 acre feet. Sin2e the emergency spillway \vas <br /> <br />perched to reduce construction cost, the actual amo~nt of storage capacity <br /> <br /> <br />. provided at this project is substantially in excess of that required to <br /> <br /> <br />control the standard project flood. A check was made in the reevaluation to <br /> <br />determine llOW this project 'Would perform during a SOD-year mountain snowmelt <br /> <br />inflow. The results indicated that this condition produced a storage require- <br /> <br />ment of 38,000 acre feet which is more critical than that required for the <br /> <br />standard project rainfall flood. <br /> <br />4. [Jpdat.cd Stnrgl"e C:3p8citips. Updated capacity 2urves h'lv'O b2en pUblished <br /> <br />since the 3torag.;? re'~valu::ltion studies were made. The ne\-1 curve fer Chatfield <br /> <br />Reservoir was published in October 1982, \'Ihile the new cur'!e for Bear Creek <br /> <br /> <br />ResC'rvoir .vas publish,~d .in ;~arch 19[13. Bot.h~f th"!s8 cur'!es are more refin"d <br /> <br /> <br />than the pr'2vious curves clOd sho'" enough chan,~e to justify 21 teration of <br /> <br />storage allocations. rlese ere sho'~ on plate 2. <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.