My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01054
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:34 PM
Creation date
10/4/2006 6:49:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />LEFT HAND DITCH CO. - LEFT HAND VALLEY RES. SPILL W AY/OUTLET REHAB. <br /> <br /> <br />The Concrete Stilling Basin and Outlet Pipe at the Bottom of the RCC Spillway <br /> <br />Proiect Description <br /> <br />This project is the result of the State Engineer's order to increase the spillway capacity of <br />the Left Hand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br />downstream structures. The project includes,the replacement of the current spillway with a larger <br />roller compacted concrete (RCC) spillway and concrete stilling basin. Rocky Mountain <br />Consultants of Longmont, CO completed the permitting process, design engineering and <br />preparation of construction contract documents. The construction contract was awarded to Gears, <br />Inc. of Crested Butte, CO., commenced September 1, 1998 and was completed in January 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Left Hand Ditch Company, Inc. County: Boulder <br /> <br />River: Left Hand Creek <br /> <br />Terms of Loan: $560,000.00 @4.0% for 30 yrs. <br /> <br />Substantial Completion Date: Jan. 13, 1999 <br /> <br />Design Engineer: Rocky Mountain Consultants, Inc. - Longmont, Colorado <br /> <br />Construction Contractor: Gears, Inc. - Crested Butte, Colorado <br /> <br />Design Criteria: <br /> <br />Dam Height = 51.25 ft. Dam Crest Elev. = 5,359.5 ft. <br />Spillway Crest Elev. = 5,351.5 ft. Reservoir Capacity = 2,814 ac.ft. <br />Spillway Type = Stepped Roller Compacted Concrete <br /> <br />. Annual Volume of Water Delivered by the Project: 1,624 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.