Laserfiche WebLink
<br />, <br />j <br /> Western Mutual Ditch Company <br />. 43.3378.002.00 <br /> Material Quantities and Cost Estimate for South Platte River Channel Improvements <br /> Summary of Preliminary Quantities and Costs <br /> Item Description Quantity Unit Unit Cost Cost Estimate <br /> Low High Low High <br /> 1 Riprap in Spurs 6500 tons $7 $10 $45,500 $65,000 <br /> 2 Bedding in Spurs 2100 tons $11 $13 $23,100 $27,300 <br /> Subtotal Spurs $68,600 $92,300 <br /> ~ <br /> 3 Riprap in Revetment 3100 tons $7 $10 $21,700 $31,000 <br /> 4 Bedding in Revetment 900 tons $11 $13 $9,900 $11,700 <br /> Subtotal Revetment $31,600 $42,700 <br /> ~ <br /> 5 Grouted Riprap Drop 1 each $30,000 $50,000 $30,000 $50,000 <br /> (V <br />e 6 Concrete Crest Drop 1 each $93,200 $125,200 $93,200 $125,200 <br />CV <br /> 7 Sheet Pile Drop 1 each $62,900 $82,200 $62,900 $82,200 <br /> ~ <br /> 8 Sloping Riprap Drop 1 each $70,500 $91,200 $70,500 $91,200 <br /> Total Costs <br /> wi Grouted Riprap Drop $130,200 $185,000 <br /> wi Concrete Wall Drop $193,400 $260,200 <br /> ---?> 1 wi Sheet Pile Drop I (PRE,cEF-J?EL) A&W./4T7//C) $163,100 $217,200 <br /> wi Sloping Riprap Drop $170,700 $226,200 <br /> Note: Costs are preliminary and do not include miscellaneous items and contingencies. <br /> <br />e <br /> <br />Prepared by Rocky MOUnlOiln Consultants. lne. <br /> <br />Printed 27-Msr-98 <br /> <br />G;\337B_002.MMC\CONSTEST.W82 <br />