My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01021
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:11 PM
Creation date
10/4/2006 6:48:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
CF Section - Update on Existing Authorizations - Ute Water Conservancy District - Plateau Creek Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~:'r;. <br /> <br />.-;- " <br /> <br />" <br /> <br />~ <br /> <br />\ <br /> <br />The RPA, as documented in the February 1998 Final Biological Opinion for the project, <br />allows the Recovery Implementation Program for Endangered Fish in the Upper Colorado <br />River Basin to serve as the RP A for both historic depletions by the District as well as the <br />first 3,000 acre-feet of new depletions from the project. A further condition is that the <br />Grand Valley Water Management Project is completed on schedule, Future project <br />depletions in excess of 3,000 acre-feet will require initiation of further Section 7 <br />Consultation. <br /> <br />. <br /> <br />Status of Permittinl! Activities <br /> <br />In addition to the ROW permit and Section 7 Consultation, a 404 Dredge and Fill Permit <br />from the Corps of Engineers and a Mesa County Conditional Use Permit are required. <br />Table 3 summarizes the status of permitting activities for the project <br /> <br />Table 3 - Status of Permitting Activities <br /> <br />Item <br />BLM Ri ht-of- Wa Permit <br />404 Dred e and Fill Permit <br />Section 7 Consultation <br />Mesa Count Conditional Use Permit <br /> <br /> <br />. <br /> <br />Water Ril!hts <br /> <br />The District has an extensive portfolio of water rights in the Plateau Creek and Rapid <br />Creek basins as well as on the Colorado River. The estimated yield of the District's water <br />rights to meet the year 2045 demand indicates that all but about 4,000 acre-feet (Colorado <br />River and Rapid Creek supplies) would be supplied from the Plateau Creek watershed <br />and conveyed to the treatment plant by the Plateau Creek Pipeline. <br /> <br />Financial Analvsis <br /> <br />For the total estimated project cost of $30,311 ,000, the District currently anticipates using <br />the sources shown in Table 4: <br /> <br />Table 4 - Plateau Creek Project, Sources of Funds <br /> <br />Source Amount <br />Remaininl! CWCB Construction Fund Authorization $6,427,151 <br />New Borrowinl!, 1999 10,000,000 <br />New Borrowinl!, 2000 10,000,000 <br />From District Reserve Funds 3,883,849 <br />Total $30,311 ,000 <br /> <br />. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.