My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01018
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:09 PM
Creation date
10/4/2006 6:48:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/22/2000
Description
CF Section - Reversal of Residual Project Funds
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />t <br />~ <br /> <br />11 <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conse17Jation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone, (303) 866-3441 <br />FAX, (303) 866-4474 <br /> <br />~ <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Peter H. Evans <br />ewes Director <br /> <br />TO: <br /> <br />C I d W C . B d M b Dan McAuliffe <br />o ora 0 ater onservatlOn oar em ers D ty D' t <br />epu tree or <br />Mike Serlet, Chief, Water Supply Planning and Finance sec~ <br /> <br />May 16, 2000 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Agenda Item #13 - May 22-23, 2000, Board Meeting <br />Water Supply Planning and Finance <br />Reversal of Residual Project Funds <br /> <br />Introduction <br /> <br />When a project from the Construction Fund is completed, de-authorized, or <br />amended, residual or unused funds sometime remain in the project account. These <br />encumbered project funds must be unencumbered or reversed back into the unreserved <br />cash balance of the Construction Fund by the Department of Natural Resources (DNR) <br />Controller's Office or they cannot be used for other purposes. <br /> <br />Background <br /> <br />The administrative and communication processes necessary to reverse completed <br />project residual funds back to the unreserved cash balance in the Construction Fund have <br />not been clear between the CWCB and the DNR Controller for the past several years. A <br />rather lengthy list of projects with residual encumbered project amounts totaling over <br />$10,000,000 has resulted. <br /> <br />The attached list of project loans, feasibility studies, grants and non-reimbursable <br />projects have been completed with residual or unused funds remaining from the original <br />appropriated amounts. These funds have remained encumbered by the DNR Controller <br />and consequently have not been made available for new water project loans or grants. <br />
The URL can be used to link to this page
Your browser does not support the video tag.