Laserfiche WebLink
<br />1.1 Caso No. 01 CW305 <br /> <br />Case No. Q1CW305 proposes an augmentation and exchange plan that will provide a <br />legal water supply for approximately 120 additional water contracts in the District who <br />are now operating under an annual Substitute Water Supply Plan. A major source of <br />augmentation releases in this case is Ruedi Reservoir, located on the Fryingpan River. <br />Releases from the reservoir enter the Roaring Fork River at its confluence with the <br />Fryingpan. Of the 120 water contracts. 20 are located within the upper Roaring Fork <br />River above its confluence with the Fryingpan River. These 20 contracts will be <br />augmented by exchange. as the reservoir releases do not directly enter this reach of <br />river. <br /> <br />This application. often referred to as the -Batch Plan-, is a requirement of the BWeD's <br />approved Substitute Water Suppty Plan. As a condition of approval of the Substitute <br />Water Supply Plan, the State Engineer requires the aWCD 10 move its contractees from <br />the Substitute Water Supply Plan to a decreed plan for augmentation and exchange. <br />Case No. 01 CW305 is one in a series of plans fOf augmentation that have been decreed <br />as required. <br /> <br />1.2 Case No. 02CW77 <br /> <br />Case No. 02CW77 outlines a plan for augmentation and exchange fOf water users that <br />will receive service from the aWCD on Of after January 1, 2004. The application, <br />referred to as the ~UmbreUa Plan: seeks to establish specific exchange reaches and <br />limited exchange amounts at locations throughout the aWCD service area induding the <br />Roaring Fork River above its connuence with the Fryingpan River. Within the upper <br />Roaring Fork reach, the aWCD requests an exchange of up to 2.25 cfs of depletion with <br />a priority date 01 July 2. 200 1. <br /> <br />6 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br />