My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01011
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:01 PM
Creation date
10/4/2006 6:48:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/24/2001
Description
CF Section - Consolidated Home Supply Ditch and Reservoir Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Consolidated Home Supply Ditch and Reservoir Co. <br />September 24-25, 2001 <br /> <br />Agenda Item 168. <br /> <br />Table 3. Financial Summary <br /> <br />Pro'ect Cost <br />Number of Shareholders <br />Number of Shares of Stock <br />CWCS Loan Amount <br />CWCS Loan Pa ment includes 10% reserve <br />Current Assessment er share <br />New Assessments er share <br />Anl'1ual Loan Cost acre-fooL mean reservoir slqra e: 7,522 Be-ft <br /> <br />$1,048,000 <br />275 <br />2001 <br />$943,000 <br />$56,399 <br />$125 <br />$153 <br />.$1.5Q <br /> <br />Credit worthiness: The CHSDRC has an existing loan with the USDA Rural Development on <br />which all payments have been made as agreed. The outstanding loan balance is approximately <br />$350K. The CWCS would need parity with this loan, or the Company would need to pay it off. <br />Table 4 shows the Financial Ratios for the CHSDRC:and indicates that, with the exception of <br />cash reserves, average ability to repay the $943K CWCS loan with the project in place. <br /> <br />Table 4. Financial Ratios <br /> <br />Financial Ratio Without With <br /> . the oroiect the oroiect <br />Operating Ratio (revenue/expense) ,104% 109% <br />weak: less than 100% (average) (average) <br />average: 100% - 120% . <br />strono: areaterthan 120% . <br />Debit Service Coverage Ratio 77% 100% <br />(revenues-expenses)/debt service (weak) (average) <br />weak: less than 100% <br />average: 100% - 125% <br />strona: areater than 125% <br />Cash Reserves to Current Expense :55% 17% <br />weak: less than 50% i(average) (weak) <br />average: 50% - 100% <br />strona: areater than 100% <br />Annual Cost per Acre-Foot (23,623 ac-ft) :$ 11.41 $13.80 <br />weak: greater than $20 j (average) (average) <br />average: $10 . $20 <br />strona: less than $10 <br /> <br />As security for the loan the CHSDRC will pledge a~sessment revenues backed by assessment <br />covenant and the project itself. This security is in cpmpliance with CWCS Loan Policy #5 <br />(Collateral). <br /> <br />4 <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.