Laserfiche WebLink
<br />minimum recommended PI of 75. The slope is also less than the recommended <br />slope of O.5'Yo as presented in the main body of this Manual. However, subject to <br />the cautionary comments above on instream flow filings by CWCB, this stream <br />reach may be appropriate for other activities such as tubing or simple passage of <br />boats, <br /> <br />. <br /> <br />The Applicant's design engineer could also evaluate the site to determine the <br />feasibility of increasing the slope via physical changes to the natural stream <br />course and/or an increased flow rate, if available. <br /> <br />. <br /> <br />. <br /> <br />II <br />