My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00995
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:52 PM
Creation date
10/4/2006 6:48:14 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Changes in Existing Loans - City of Sterling - Pawnee Creek Flood Control Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />The proposed project win provide flood protection to over 1,400 properties in the vicinity of <br />Sterling, Colorado. <br /> <br />The City's ability to repay the CWCB loan is based on an existing funding mechanism and requires <br />no additional action. <br /> <br />RECOMMENDATION <br />The staffrecommends an increase in the City of Sterling's authorization an amount of $700,000 for <br />a total Construction Fund loan of $1,250,000 be approved for the purpose of constructing the <br />proposed floodplain project. Staff recommends a 20-year term for the loan and the Municipal Low <br />Income lending rate for 1999 as may be approved by the Board at the November 1998 Board <br />Meeting. The Municipal Low-Income rate is based on MHI of$20,189. <br /> <br />It is further recommended as a condition of the loan that the City provide an opinion from its <br />attorney on its ability to incur debt without holding a TABOR election and the amends its project <br />feasibility study in accordance to the CWCB Construction Fund Guidelines. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.