Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />The proposed project win provide flood protection to over 1,400 properties in the vicinity of <br />Sterling, Colorado. <br /> <br />The City's ability to repay the CWCB loan is based on an existing funding mechanism and requires <br />no additional action. <br /> <br />RECOMMENDATION <br />The staffrecommends an increase in the City of Sterling's authorization an amount of $700,000 for <br />a total Construction Fund loan of $1,250,000 be approved for the purpose of constructing the <br />proposed floodplain project. Staff recommends a 20-year term for the loan and the Municipal Low <br />Income lending rate for 1999 as may be approved by the Board at the November 1998 Board <br />Meeting. The Municipal Low-Income rate is based on MHI of$20,189. <br /> <br />It is further recommended as a condition of the loan that the City provide an opinion from its <br />attorney on its ability to incur debt without holding a TABOR election and the amends its project <br />feasibility study in accordance to the CWCB Construction Fund Guidelines. <br /> <br />5 <br />