My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00995
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:52 PM
Creation date
10/4/2006 6:48:14 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Changes in Existing Loans - City of Sterling - Pawnee Creek Flood Control Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866.3441 <br />FAX: (3031 866.4474 <br /> <br />STATE OF COLORJ\DO <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Oaries C. lire, P.E. <br />Director, eWeB <br /> <br />Peter H. Evans <br />Acting Director, eweB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />Larry Lang ~ <br /> <br />DATE: <br /> <br />November 16,1998 <br /> <br />SUBJECT: Agenda Item 23b, November 23-24, 1998, Board Meeting- <br />City of Sterling - Pawnee Creek Flood Control Project <br /> <br />Change in an Existing Loan from the <br />Project Construction Loan Program <br /> <br />INTRODUCTION <br />The City of Sterling (City) requests an increase to their 1998 CWCB Construction Loan Approval <br />amount. With the passage of House Bill 98-1189, the City of Sterling received authorization and <br />funding in the amount of $550,000 for the Pawnee Creek Flood Control Project (project). To <br />complete the project funding package, the City is applying for an additional $700,000 funding to <br />assist with the construction of the Pawnee Creek Flood Control Project. Please see the attached <br />project summary map. <br /> <br />BACKGROUND <br />Presentations by CWCB and City staff regarding this project were made at the November 24,1997 <br />CWCB meeting. The presentation at the November 1998 Board meeting will be a status and <br />update report to the Board members regarding the project. The scope of the project is essentially <br />the same as presented to the Board at the November 1997 meeting. <br /> <br />The City and Logan County (County), in cooperation with the Board, have performed an updated <br />feasibility study entitled "Flood Hazard Mitigation Feasibility Study" dated February 1998. The <br />new study includes an Environmental Assessment (EA) that is in progress for the project. The <br />completion of the EA and hydrology analysis is scheduled for December 31, 1998. <br /> <br />The total cost of the entire Pawnee Creek Flood Control Project is estimated to be $3,214,000. The <br />City in cooperation with the County has already expended over $100,000 in engineering fees for <br />the project. In addition to the 1998 construction fund authorization ($550,000), the project has <br />received a conditional FEMA - HMGP award in the amount of$815,000, Logan County $250,000 <br />in-kind, UPRR $400,000 in-kind, and City of Sterling $499,000 caSh. Table 1 provides a <br />breakdown by project component for the approximate project cost of $3.2 million. <br />
The URL can be used to link to this page
Your browser does not support the video tag.