My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00992
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:51 PM
Creation date
10/4/2006 6:48:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2003
Description
State and Federal Legislative Issues
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 water conservation board is hereby autJ,lOrized to loan moneys from the <br />2 severance tax trust fund perpetual base account to enable the construction <br />3 of the following water resources projects with the following priority: <br />4 Priority Borrower-Project Loan Amount <br />5 (a) Mancos Water Conservancy District <br />6 Water System Rehabilitation* - $ 5,486,531 <br />7 (b) Little Thompson Water District <br />8 Dry Creek Reservoir Construction - $ 3,937,500 <br />9 (c) Central Weld County Water District <br />10 Dry Creek Reservoir Construction - $ 3.937.500 <br />11 Total $13,361,531 <br />12 * This loan is to refinance water projects wholly or partially completed <br />13 (2) The Colorado water conservation board may make loans for <br />14 the construction of the projects specified in subsection (1) of this section <br />15 from such moneys as are or may hereafter become available to the <br />16 severance tax trust fund perpetual base a;Ccount. Said loans shall be in the <br />17 amounts listed in subsection (1) of this section plus or minus such <br />18 amounts, if any, as may be justified by reason of ordinary fluctuations in <br />19 construction costs as indicated by the engineering cost indices applicable <br />20 to the types of construction required i for each project or as may be <br />21 justified by reason of changes in the plans for a project due to differing <br />22 or unforeseen site conditions, errors :ot omissions in the plans and <br />. 23 specifications, changes instituted by regulatory agencies, or changes in <br />24 material quantities beyond contract limits. <br />25 (3) Pursuantto section 37-60-120 (1), Colorado Revised Statutes, <br />26 the board shall require such terms and cQnditions in such contracts as will <br />27 ensure repayment of funds made available by it. The board shall not <br /> <br />-4- <br /> <br />SB03-110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.