Laserfiche WebLink
<br />It <br /> <br />. <br /> <br />. <br /> <br />the City's own analysis as part of the Yampa River Management Plan, and the results of <br />recreational user surveys completed by the CWCB's experts, showed that the claimed flows <br />were more than double the minimum amount necessary to accomplish the intended uses. <br />Following closing arguments, the Water Judge ruled that the failure to provide any hydraulic <br />analysis or engineering was not a fatal flaw and that the City had carried its burden of proof. <br />However, before the City may place a call, the Court ordered that engineering design drawings, <br />signed and sealed by a professional engineer, be delivered to the Division Engineer. <br /> <br /> <br />7 <br />