My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00970
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2010 4:52:34 PM
Creation date
10/4/2006 6:47:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/1993
Description
Agenda or Table of Contents, Minutes, Memos. Partial.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />f. Case No. S-92CW217; Johnson <br />Action: A motion was made by Tommy Thompson that the Board ratify the <br />attached stipulation with Mark and Karen Johnson. The motion was <br />seconded by Dave Meyring and passed nmmimously (7-0). <br /> <br />L Case No. 6-92CW044; Larry Lane Johnson <br />Action: A motion was made by Dave Smith that the Board ratify the attached <br />stipulation with Larry Lane Johnson. The motion was seconded by <br />Janice Sheftel and passed nmmimoliSly (7-0). <br /> <br />j. Case No. 7.92CW019; Anderson <br />Action: A motion was made by Tommy Thompson that the Board ratify the <br />attached stipulation with Houston and Connie Anderson. The motion <br />was seconded by David Smith and the motion was passed unanimously <br />(6-0), with Janice Sheftel recusing herself. <br />18g&h. Instream Flow Program: Stipulations 9:00 - 9:10 am. <br />Tape 2, Start/Stop . . 2979 - 3400 <br />Action: A motion was made by Ken Salazar to approve the stiplulation <br />submitted to us in Case Nos. 5-92CW292, 298. The motion was <br />seconded by David Harrison and the motion was passed nnanimously <br />(9-0). <br /> <br />19a, b, C, d, Instream Flow Program: Staff Actions <br />Tape 5, Start/Stop 324 - 330 <br />Case No. 4-93CW049; Landsford <br />Case No. S-93CW078; Benedict <br />Case No. S-93CW049; Riggs <br />Case No. 7.93CWOI7; Sittner <br />Action: David Harrison moved the ratification of staff action on 19, a, b, C, and <br />d. David Smith seconded the motion and it passed nnanimously, (6-0). <br /> <br />2080 <br /> <br />Instream Flow Program: Request for Extension or Time 9:10 - 9:15 am. <br />Copper Mountain <br />Tape 2, Start/Stop 3401 - 3639 <br />Action: A motion was made by Tommy ThOIDSO!l to approve the staff <br />recommendation to grant the five year extension until October, 1998 <br />to complete construction of the Tenmile Creek Pipeline. The motion <br />was seconded by Janice Sheftel and passed llf1animously (9-0). <br /> <br />21a. <br /> <br />Instream Flow Program: Authorization to proceed to Trial <br />Tape 5, Start/Stop <br />Case No. 1-02CW079; Oty of Louisville <br />Action: A motion was made by David Smith to authorize the staff to enter into <br />settlement or if settlement is not possible, to proceed to trial. The <br />motion was seconded by Janice Sheftel. David Harrison stated for the <br /> <br />5:53 - 5:55 pm. <br />253 - 307 <br /> <br />Draft Minutes for July, 1993 CWCB Meeting <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.