My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00963
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:19 PM
Creation date
10/4/2006 6:47:26 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2004
Description
CF Section - New Loans - Young Creek Reservoir Company - Reservoir #1-2 Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />\ <br /> <br />. <br /> <br />Water Project Construction Loan Program - Project Data Date <br /> <br />Borrower: Young Creek Reservoir Company <br /> <br />County: Delta <br /> <br />Project Name: Young Creek Res. # 1-2 <br /> <br />Project Type: Reservoir Rehabilitation <br /> <br />Drainage Basin: Gunnison <br /> <br />Water Source: Young Creek <br /> <br />Total Project Cost: $217,125 <br /> <br />Funding Sources: ewes, Surface Creek Bank <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 782 acre-feet (decreed capacity) <br /> <br />CWCB STTFPBA Fund Loan: $195.400 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />YCRC provides irrigation water to a 40Q-acre service area in Delta County near the Town of <br />Cedaredge. The YCRC owns & operates two reservoirs, the Reservoir #1-2 (a combined <br />reservoir), and Reservoir #3. both located on Grand Mesa. Reservoir #1-2 has a decreed capacity <br />of 782 acre feet, and is over 100 years old. The existing dam is a Class 2 dam, with a length of 505 <br />feet, height of 46 feet. crest width of 15 feet, and spillway width of 25 feet. There is a history of <br />seepage problems, and a recurring incidence of sinkholes in the area immediately upstream of the <br />dam. along the left abutment. This has necessitated temporary sinkhole repairs on several <br />occasions. as well as instituting a monitoring program to assess the performance of the dam. In <br />2001, a geotechnical investigation was completed and paired piezometers were placed within the . <br />embankment structure. Since the installation the reservoir has not filled due to the drought. and it <br />has not been possible to evaluate dam performance over the past two years. Several time <br />extensions for perfonnance reporting have been granted by the SED. YCRC wants to make the <br />most critical repairs now to avoid potential loss of function of the reservoir and possible restriction. <br />Currently, the dam is approved for conditional full storage, requiring continued efforts to address left <br />abutment seepage. The proposed liner project will address the immediate sinkhole problem by <br />installing a 60 mil HOPE (High Density Polyethylene) liner over an area about 200 feet long by 140 <br />feet wide, covering a total of 3100 sq. yards, in the area of sinkhole occurrence. Future monitoring <br />of the dam perfonnance after the initial repair will allow YCRC to determine if additional repairs are <br />necessary. <br /> <br />GRAND <br />JUNCTION <br />?;:!!,"- <br /> <br /> <br />...._. .-"7"\\~.' I <br /> <br /> <br />. <br /> <br />G'.nGt,IM& <br />N.,.......' <br />~OI'.., <br /> <br />1 <br /> <br />, <br /> <br />/ <br /> <br />! i <br />, <br />'J4.. ,.-.. Hor<~k"'..L( <br />I !~I ~~T~..~ /~ t2 ~ '. i~ <br />"I "-rn .. .~"'n t..,e.. " <br />"_.- " . <br />- .~.... .... <br />~~- < <br /> <br />./ <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.