My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00961
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:18 PM
Creation date
10/4/2006 6:47:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/2003
Description
Flood Section - Probable Maximum Precipitation Site-Specific Study for the Cherry Creek Reservoir-Study Findings and Recommendations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. 'OJ ...~, . <br /> <br />Executive Summary <br /> <br />Applied Weather Associates (A W A) assembled a team of experts to conduct an <br />independent site-specific Probable Maximum Precipitation (PMP) study for the Cherry <br />Creek drainage basin. In addition, the A W A team performed a technical review of the <br />1995 National Weather Service (NWS) PMP study titled "Site-Specific PMP for the <br />Cherry Creek Drainage in Colorado". This project was supported by the Colorado Water <br />Conservation Board (CWCB), Arapahoe and Douglas Counties, and the cities of Aurora <br />and Greenwood Village. <br /> <br />The study was managed by the Proj ect Advisory Committee (PAC) and the <br />CWCB (PAC members are listed in Appendix C). Technical aspects of the study were <br />reviewed by the Technical Review Panel (TRP) with members from the Colorado <br />Climate Center, Bureau of Rec1amation and a private engineering firm. The United <br />States Army Corps of Engineers (USACE) and the NWS were also given opportunities to <br />review the study. During the study, two interim reports were provided to the CWCB, the <br />PAC, the TRP, the USACE and the NWS along with a draft Final Report. <br /> <br />Both the NWS study and the A W A team study were conducted using the same <br />definition ofPMP used by the NWS, the World Meteorological Organization and the <br />National Research Council provided below: <br /> <br />"Probable Maximum Precipitation (PMP) is defined as theoretically <br />the greatest deoth of precipitation for a given duration that is <br />physically possible over a given size storm area at a particular <br />geof!raphicallocation at a certain time of year". <br /> <br />The A W A team study produces approximately 2S percent less precipitation <br />than the NWS study using the same definition ofPMP. The A W A team used a storm- <br />based, site-specific PMP methodology. The NWS relied on the general PMP <br />methodologies contained in Hydrometeorological Reports (HMR) 52 and 55A. <br /> <br />The primary difference between the two approaches is that the A W A team <br />approach was based on the use of storm characteristics of Colorado extreme rainfall <br />events while the NWS incorporated the characteristics of29 storms listed in HMR 52 that <br />occurred in the eastern two-thirds of the country. Most of the methodologies used are <br />more similar than dissimilar. <br /> <br />The A W A team performed a detailed review of the fourteen largest Colorado <br />extreme precipitation events that included Colorado storms referenced in HMRs 52 and <br />55A. Use of Colorado storms maintains the "geographic location" requirement of the <br />PMP definition. The following two findings form the basis for the primary differences in <br />the two study results: <br /> <br />V1ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.