My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00953
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:14 PM
Creation date
10/4/2006 6:47:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - Changes in Existing Loans - Windsor Reservoir and Canal Company - System Rehabilitation Projects
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />The Company has now completed those two projects and is requesting funding for three <br />more projects to be undertaken this year. Table I summarizes the status of the projects <br />that were described in the 1995 feasibility study. <br /> <br />. <br /> <br />Table 1. Windsor Reservoir and Canal Company - Status of Projects <br /> <br />Project Status <br />Poudre Valley Canal Completed <br />Cobb Lake Pipeline Completed <br />Annex No.8 Outlet Sclleduled for 2000 <br />Elder Reservoir Outlet Scheduled for 2000 <br />Windsor Reservoir No.8 Outlet Scheduled for 2000 <br />Cobb Lake Outlet Conduit After 2001 <br />Cobb Lake Inlet Structure After 2001 <br /> <br />Proiect SDonsor <br /> <br />The WRCC is a non-profit corporation established in 1890 to provide irrigation water to <br />ditch systems owned by its members. The Company has 1,000 shares of stock <br />outstanding with about 350 shareholders. <br /> <br />The Company owns six storage reservoirs and over 25 miles of water supply canal as <br />shown on the attached map. These facilities supply an average of about 30,000 acre-feet <br />of water per year for irrigation of approximately 55,000 acres in northeast Colorado. <br />Many components of the system have been in use for almost 100 years and are in need of <br />rehabilitation. <br /> <br />. <br /> <br />All water for the system is diverted from the Cache la Poudre River through the Poudre <br />Valley Canal under a portfolio of relatively senior water rights. The Poudre Valley Canal <br />is a supply canal and is used to fill all six of the Company's reservoirs. <br /> <br />Pro Dosed Proiect <br /> <br />The Company is proposing the replacement of the outlet structures on three of their . <br />reservoirs: Annex No.8, Elder Reservoir and Windsor Reservoir No.8 based on the <br />results of an inspection of all three late last year. All three outlet conduits are constructed <br />of wood stave pipe that is badly in need of replacement. Because of the condition of the <br />pipe at Elder Reservoir, a sinkhole developed in the dam. For these reasons, the WRCC <br />believes that these projects need to be undertaken as soon as possible. <br /> <br />Smith Geotechnical has estimated the construction costs for all three projects as <br />summarized in Table 2. Total project costs with engineering and contingencies are shown <br />in Table 3. These cost estimates are about 46 percent higher than the estimates in the <br />1995 feasibility study based on recent bids received by the engineer and some additional <br />work required for Annex No.8. <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.