My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00949
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:57 PM
Creation date
10/4/2006 6:46:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />11 <br /> <br />Loan Marketing Update <br /> <br />Table (1): Applications Pending <br />Table (2): Additional Prospects for 2001 <br /> <br />TABLE 1 APPLICATIO:~S PENDING <br />BORROWER PROJECT DESCRIPTION <br /> <br />Glenwood Irrigating Co. Construct neW diversion structure. $108K estimated <br />(Garfield Co.) total project cost. Small Project loan. <br />Scheduled for Jul 2001 consideration. <br />Construct augmentation and groundwater recharge <br />project. $120K estimated total project cost. Small <br />project loan. <br />Scheduled for Ma 2001 consideration. <br />Rehabilitate the Tilton Lateral. $141K estimated total <br />project cost. Small project loan. <br />Scheduled for Ma 2001 consideration. <br />Total Amount of A lications Pendin ........ <br /> <br />AMOUNT <br />$85K <br /> <br />Lower South Platte Water <br />Conservancy District <br />(Logan, Morgan, Sedgwick, <br />Washin ton Co. <br />Tilton Lateral, Inc. <br />(Mesa Co.) <br /> <br />$100K <br /> <br />StOOK <br /> <br />$28SK <br /> <br />TABLE (2) ADDITIONAL PROSPECTS for 2000 <br />BORROWER PROJECT DESCRIPTION AMOUNT <br />Central WCD Rehabilitate Klug Reservoir. $IM estimated total $900K <br />(Weld Co.) proiect cost. <br />Conejos WCD District River restoration project. $lOOK <br />(Coneios Co.) <br />Crystal Lakes W &8 Assoc. Construct new 300 AF reservoir. $1.5M estimated total $l.1M <br />(Larimer Co.) proiect cost. <br />Dover Creek, Town Construct new raw water irrigation system. $lM $900K <br />(Dolores Co.) estimated total proiect cost. <br />Fish Hatchery loans Rehabilitate fish hatcheries (House Bill 01-1024) $900K <br />(State wide) $IM estimated total proiect cost. <br />Glenwood Irrigating Co. Rehabilitate siphon. $500K estimated total project cost. $375K <br />(Garfield Co.) <br />Lake Henry Reservoir Co. Rehabilitate Lake Henry Dam. $2M estimated total $ 1. 8M <br />(Crowley Co.) project cost. <br />La Plata Water Conservancy Construct new reservoir in western La Plata County. $100K <br />District $SM estimated total project cost. $300K Feasibility (Grant) <br />(La Plata Co.) Study cost. <br />Grand Mesa Res. Co. Rehabilitate the outlets on Grand Mesa Reservoirs #1 $68K <br />(Mesa Co.) and #9. $75K estimated total project cost. <br />Lyons, Town of Construct new 500 AF reservoir. $2M estimated total $1.5 M <br />(Boulder Co.) project cost. <br />Mancos, Town of Construct new raw water irrigation system. $l.5M $1.35M <br />(Montezuma Co.) estimated total project cost. <br />Owl Creek Reservoir Co. Rehabilitate Owl Creek Reservoir. $1 .3M estimated $975K <br />(Weld Co.) total project cost. <br />Supply Irrigating Ditch Co. Rehabilitate Knoth Reservoir. $1.9M estimated total $1.7M <br />(Boulder Co.) proiect cost. <br />Thornton, City of Rehabilitate Standley Lake in accordance with State $SM <br />Westminster, City of Engineer safety requirements. $36M estimated total $SM <br />(Jefferson Co.) proiect cost. Two separate loans. <br />Silt Water Cons. District Rehabilitate two siphons and pump house. $1.5M $1.35M <br />(Garfield Co.) estimated total project cost. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.