My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00947
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:55 PM
Creation date
10/4/2006 6:46:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Changes in Existing Loans - City of Loveland - Green Ridge Glade Reservoir Enlargement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />SUMMARY OF PROPOSED PROJECT <br />CITY OF LOVELAND <br />GREEN RIDGE GLADE RESERVOIR ENALRGEMENT <br /> <br />Proiect Sponsor: City of Loveland <br /> <br />Tvpe of Proiect: Municipal water supply - reservoir enlargement <br /> <br />Location: About seven miles west of Loveland in Larimer County (see attached map and <br />schematic) <br /> <br />Date of Application: December 26, 1996 <br /> <br />Plannine Studies Submitted: <br /> <br />Phase I - Drought Study, August 1986, Camp Dresser & Mckee, <br /> <br />Phase II. Evaluation of Alternatives, January 1988, Camp Dresser & Mckee, <br /> <br />Feasibility Report, Green Ridge Glade Reservoir Expansion Project, October 1997, Woodward- <br />Clyde <br /> <br />Proiect Description: The City of Loveland is proposing to expand its existing Green Ridge <br />Glade Reservoir from a capacity of 600 acre-feet to 6,000 acre-feet. The project will include <br />raising the existing earth embankment dam and replacing the existing intake tower, outlet works, <br />and spillway as well as relocating an existing county road in the reservoir area. The City hopes <br />to begin design in 1999 and construction in the year 2000. <br /> <br />Estimated Cost: $20.0 million <br /> <br />Existine Authorization: $2.0 million in HB 98-1189 <br /> <br />Requested Additional Fundin!!: $3.0 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.