Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />J <br /> <br />Long- Term Proiected Expendilures <br /> <br />The long-term projected expenditures from the Construction Fund were based on several <br />assumptions and an aggressive program of water resources development. The major assumptions <br />used to project long-term expenditures for each of several categories established by the Board are <br />listed below: <br /> <br />. Compact Entitlement through New Storage - Objective 1 of Goal 2 ofthe Board's Long <br />Range Plan is to "enhance water supplies and develop Colorado's compact allocations," In <br />1993, the State Engineer identified 36 dams on the western slope which could be enlarged <br />by a total addition of approximately 166,000 acre-feet (see Appendix D). Assuming an <br />average cost of$I,OOO per acre-foot to enlarge these reservoirs, the total cost is estimated at <br />$166,0 million. Assuming loans will be made at 75-percent of the total cost over the next <br />10 years, future expenditures for new storage could be as high as $124.5 million, or an <br />average of about $12.0 million per year. <br /> <br />Objective 2 of Goal 2 of the Long Range Plan is to promote "specific projects" including the <br />Animas-La Plata Project, enlargement of Elkhead Reservoir, and a reformulated San Miguel <br />Project. It has since been determined that enlargement of Elkhead Reservoir will not be <br />funded through the Construction Fund, although the City of Craig may use their 10an <br />authorization to rehabilitate the spillway, <br /> <br />Other specific projects identified from our future prospects lists and a statewide needs survey <br />of water users in 1993 were also included in the projection as an indication of potential future <br />water resources projects. Loans for futurt' unspecified feasibility studies will be estimated <br />at $200,000 per year. <br /> <br />. Compact Entitlement through Dam Rehabilitation - Objective 5 of Goal 2 ofthe Long <br />Range Plan is for the "rehabilitation of restricted storage capacity." The State Engineer has <br />restricted storage in 188 reservoirs in Colorado for dam safety pmposes (see Appendix D). <br />The total volume currently restricted is 132,795 acre-feet with 24% in the South Platte River <br />basin, 62% in the Arkansas River basin, 7% in the Rio Grande basin, and 7% on the westem <br />slope. Assuming an average cost of$1,500 per acre-foot to fix these dams, the total cost is <br />estimated at $199.2 million. Assuming loans will be made at 75-percent of the total cost <br />over the next 10 years, future expenditures for dam rehabilitation could be as high as $149,4 <br />million, or an average of about $15.0 million per year, <br /> <br />A <br /> <br />. Water Resources Infrastructure - Objective 6 of Goal 2 of the Long Range Plan is to <br />"rehabilitate existing infrastructure." Future rehabilitation of water resources infrastructure <br />such as diversion structures, pipelines, headgates, canals, ditches, and other raw water <br />collection and delivery facilities will be estimated at up to $5.0 million in loans per year. <br /> <br />A <br /> <br />A <br /> <br />15 <br /> <br />A <br />