My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00939
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:48 PM
Creation date
10/4/2006 6:46:50 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
Flood Section - Colorado Floodplain and Stormwater Criteria Manual
Board Meetings - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'! <br /> <br />., <br /> <br />r <br /> <br />! <br /> <br />WORKSHOP AGENDA <br />March 16, 2004 <br />8 -10 AM <br /> <br />COLORADO FLOODPLAIN AND STORMWATER CRITERIA MANUAL <br />March 2004 CWCB Board Meeting <br /> <br />1. Introduction (Larry Lang) - 5 min <br /> <br />a. Needs and importance of the Statewide Manual <br />b. Purpose of the manual <br />c. Planned manual uses - state and local entities <br />d. Selection of WRC Engineering, Inc. <br />e. Project team <br /> <br />2. WRC Company Profile & Qualifications (Alan Leak) - 5 min <br /> <br />3. Roles and Actions of Advisory Committee (Stuart Gardner) - 10 min <br /> <br />4. Statewide Manual Vision (Alan Leak) -15 min <br /> <br />a. Overall manual organization (Table of Contents -handout) <br />b. Individual chapter contents (brief overview of each chapter) <br />c. Overview of the 11 Proposed Operating Principles <br /> <br />5. Discussions on the Proposed Operating Principles (Yong Song and Larry Lang) - 55 min <br />11 Proposed Operating Principles (Rationales, Principles, and Applications) <br />1. Criteria manual discrepancy resolution <br />2. New and revised floodplain delineations <br />3. Regulatory 1 DO-year floodplains <br />4. Designated floodways <br />5. Hydraulic structures <br />6. Hydrology <br />7. Floodplain development practices <br />8. Flood conveyance in irrigation ditches and canals <br />g. Stormwater runoff detention <br />1 D. Water rights <br />11. Water quality <br /> <br />6. Final Product and Schedule (Tom Browning) -10 min <br /> <br />a. Project status and schedule <br />b. Discuss and distribute a sample chapter (Hydrology Chapter) <br />c. CWCB Rules and Regulations (Need for updating current version) <br /> <br />7. Board and Public Comments and Discussions (20 min) <br /> <br />Handouts <br /> <br />Power Point presentation <br />Sample chapter - Hydrology <br />Two copies of the draft Manual <br />
The URL can be used to link to this page
Your browser does not support the video tag.