My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00936
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:47 PM
Creation date
10/4/2006 6:46:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado and is scheduled to commence construction in February of 2005. The Company anticipates the project to . <br />take until 2007 to complete. <br /> <br />25. Young Creek Reservoir Company - Reservoir Rehabilitation <br />Authorization: Severance Tax Fund County: Delta <br />Water Source: Young Creek Project Yield: 782 acre-feet <br />Terms of Loan: $195,400@2.5%for30yrs. Project Type: Reservoir Rehabilitation <br /> <br />Young Creek Reservoir Company provides irrigation water to a 400-acre service area in Delta County near the <br />Town of Cedaredge. The Company's system consists of Reservoir No. I, 2 and 3, all located on the Grand Mesa. <br />Reservoir No. I and 2 are a combined system that was constructed in the early 1900's, having a 46-ft. dam height at <br />a length of 505 feet. This dam has a history of seepage problems and sinkholes that have been area of concern by <br />the SEa. This project involves the placement of a HOPE liner along the dam face to address both the seepage and <br />sinkhole problem. The project is being designed by Smith Engineering and is anticipated to commence <br />construction in September of 2005. <br /> <br />26. Lower Bauer West Lateral, Inc. - Ditch Rehabilitation <br />Authorization: Severance Tax Fund County: Montezuma <br />Water Source: Mancos River Project Yield: 951 acre-feet <br />Terms of Loan: $195,000@ 2.5% for 30 yrs, Project Type: Ditch Rehabilitation <br /> <br />The Lower Bauer West Lateral owns and operates the west outlet lateral from Lower Bauer Reservoir. This <br />project involves the placement of 15,500 feet of6-15-inch PVC pipe in the ditch our outlet lateral, to reduce water <br />loss and to produce working pressure for downstream irrigation users. The project is being designed by the NRCS <br />Cortez Office to carry the Company decree of 951 acre-feet to a 1,200-acre service area. The project is scheduled . <br />for construction in February of 2005. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.