My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00924
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:21 PM
Creation date
10/4/2006 6:45:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
WSP Section - Colorado River Basin Issues - San Juan River Recovery Program - Proposed Flow Recommendations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ITEM 261 <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />8 <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Execulive Director, DNR <br /> <br />DariesC lile, RE. <br />Director, CWeB <br /> <br />Peter H. Evans <br />Acting Director, CWeB <br /> <br />TO: <br /> <br />San Juan River Recovery Implementation Program <br />Coordination Committee and Biology Committee <br /> <br />FROM: <br /> <br />Randy Seaholm ~ <br />Chief, Interstate Stream Investigations <br /> <br />DATE: <br /> <br />July 8, 1998 <br /> <br />SUBJECT: <br /> <br />San Juan River Recovery Program, Proposed Flow Recommendations <br /> <br />Purpose <br /> <br />The purpose of this memorandum is to inform the Coordination and Biology Committees <br />of concerns the Colorado Water Conservation Board and others have with the draft <br />preliminary flow recommendations. We look forward to the opportunity to discuss these <br />concerns with both Committees. <br /> <br />Introduction <br /> <br />The San Juan River Recovery Program, Long Range Implementation Plan <br />contains three flow-related milestones that were scheduled for completion on December <br />31, 1997. Those milestones are as follows: <br /> <br />3.3.2.21 There are no shortages anticipated to the water supply for the depletion <br />identified in the baseline for the Animas-La Plata Project during the research <br />period. Upon completion of, or during the research period, the water flow <br />requirements of the endangered fish species will be analyzed and the issue of <br />shortages, if any, will be addressed by the Coordination Committee under this <br />Implementation Program. If the issue of shortages is not resolved under this <br />Implementation Program, the issue will be considered as new information that <br />may result in reinitiation of consultation and will be resolved through the <br />section 7 process. <br /> <br />5.2.7. <br /> <br />Identify, recommend, and implement flows designed to maximize and maintain <br />suitable habitats for all life stages of endangered and other native fish <br />species. <br />
The URL can be used to link to this page
Your browser does not support the video tag.