My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00922
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:20 PM
Creation date
10/4/2006 6:45:50 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/2003
Description
WSP Section - Non Reimbursable Projects Monument-Fountian Creek Transit Loss Study
Board Meetings - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 2 - Policy # 14 <br />Non-Reimbursable Prioritization <br /> <br />PROCEDURE: <br /> <br />. <br /> <br />Prior to the November Bqard meeting, the CWCB staff will <br />prepare for the Board's con~ideration a summary of the technical <br />and financial characteristics lof each proposed project, program or <br />study as well as a description of the sponsoring entity for each non- <br />reimbursable investment ap~licationfrom the CWCB Construction <br />Fund. Each application will be reviewed for conformity with the <br />goals and objectives of the CWCB Long Range Plan. Non- <br />reimbursable investment applications will be considered only in <br />the following two categories I <br />a. ProjeCts of statewide iimpact or importance, <br />b. Feasibility studies q.nd demonstration projects that are <br />designed to answer [questions related to statewide water <br />issues or have significant potential to result in loans from <br />the Construction Fund or Severance Tax Trust Fund <br />Perpetual Base Accol,lIlt. <br /> <br />Proiects of statewide impact or imoortance will be prioritized and <br />recommended to the Boar4 for consideration by a committee <br />composed of the Departm~nt of Natural Resources Executive <br />Director, the CWCB Dir~ctor, the State Engineer, or their <br />representatives, and interested Board members based on the <br />following project types: <br />. Projects, programs; or studies that assist in the <br />'administration of qompact-entitled waters, or address <br />problems relating to 9ompact-entitled waters, <br />. Projects, programs or studies that facilitate solutions to <br />regional water suppl~ problems, <br />. Projects, programs Qr studies that address federal water <br />. rights issues, . <br />. Projects, programs ot studies that assist in the recovery of <br />threatened or endangered wildlife species or the <br />, <br />conservation of exi$ting wildlife species within riparian <br />ecosystems, . <br />. State satellite monitoring system improvements and other <br />projects, programs, s~dies, instrumentation or supplies that <br />assist in the collecti<~n and development of hydrologic and <br />climatologic data, and <br />. Water, river restoration, and floodplain management <br />projects, activities i and studies affecting agriculture, <br />recreation, or other; industries that economically impact. <br />significant areas of !lie state. <br />, <br /> <br />. <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.