My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00903
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:07 PM
Creation date
10/4/2006 6:45:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - Changes in Existing Loans - Ute Water Conservancy District - Plateau Creek Pipeline
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />PROJECT SUMMARY <br />UTE W ATER CONSERVANCY DISTRICT <br />PLATEAU CREEK PIPELINE PROJECT <br /> <br />Proiect Sponsor: Ute Water Conservancy District <br /> <br />Tvpe of Proiect: Municipal water supply - pipeline replacement <br /> <br />Location: About ten miles east of Grand Junction in Mesa County (see attached map) <br /> <br />Planninl!: Studies Completed: <br /> <br />Feasibility Study, Plateau Creek Pipeline, Western Engineers, October 1987; <br /> <br />Feasibility Study Amendment Reportfor Plateau Creek Pipeline, Steffen Robertson & Kirsten, <br />February 1991; <br /> <br />Replacement of (he Plateau Creek Pipeline, Project Management Plan, Camp Dresser & Mckee <br />rnc, and others, June 1995; <br /> <br />. <br /> <br />Ute Water Service Area, Domestic Water Demand Projections, Pearse & Associates, July 1995; <br /> <br />, Plateau Creek Pipeline Replacement Project, Final Environmental Impact Statement, prepared <br />for the Bureau of Land Management, Camp Dresser & Mckee rnc, and others, February 1998, <br /> <br />Feasibility Update for Ute Water Conservancy District Plateau Creek Pipeline Replacement <br />Project, Staff of the Colorado Water Conservation Board with assistance of the staff of the Ute <br />Water Conservancy District, May 1998, <br /> <br />Proiect Description: The District is proposing to replace its existing Plateau Creek Pipeline with <br />a new line from Jerry Creek Reservoirs to the Ute Water Treatment Plant near Palisade as shown <br />on the attached map, The [mal design includes 14.5 miles of 48-inch and 54-inch diameter steel <br />pipe as well as two tunnels of 3,000 and 10,000 feet in length. The first phase of the project <br />involved 1,5 miles of pipeline and was completed in May 1999, The second and final phase <br />consists of about 13 miles of pipeline and is scheduled for completion in October of200l, To <br />date, the District has spent about $7,9 million for planning, permitting, engineering, rights of <br />way and easements and construction, Remaining project costs are estimated at $47,5 million, <br /> <br />Total Estimated Cost: $55,360,000 <br /> <br />Existinl! Authorizations: SB 88-30 for a total of$IO,6 million (Construction Fund) and SB 99- <br />173 for $7,0 million (Severance Tax Trust Fund) <br /> <br />. Requested Additional Fundinl!:: $10,0 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.