My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00900
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:06 PM
Creation date
10/4/2006 6:45:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
WSP Section - Platte River Endangered Species Cooperative Agreement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />m <br /> <br />SECTION 14 <br /> <br />US Army Corps <br />of Engineers <br /> <br />Authority for: EMERGENCY STREAMBANK AND SHORELINE PROTECTION <br /> <br />WHAT CAN THE CORPS DO? Section 14 of the 1946 Flood Control Act, as amended, provides authority for the Corps of Engineers <br />to plan and construct emergency streambank and shoreline protection projects to protect endangered highways, highway bridge <br />approaches, public facilities such as water and sewer lines, churches, public and pri vate nonprofit schools and hospitals, and other non- <br />profit public facilities. <br /> <br />The unstable conditions caused by streambank and shoreline erosion call for prompt action to eliminate the threat to public safety and to <br />prevent intenuption of vital services. This is recognized in the streamlined study and shortened time frame of the Section 14 program. <br />Federal costs are limited to not more than $1,000,000 in one locality during any fiscal year. Costs of lands, easements, and operation and <br />maintenance of the project must be non-federal. . <br /> <br />_._-~-~--------,-,,_.- <br />A Section 14 project may iilCliiden-ewstreambankorshoreliiie protection wOfKs;orit ma)'repilif,restore,ot modify existing works. <br />Each project must constitute a complete solution to the problem and not commit the federal government to additional improvements to <br />ensure effective protection. . <br /> <br />A project is accepted for construction only after investigation shows its engineering feasibility, environmental acceptability, and economic <br />Justification. The planning and design analysis (PDA), conducted at federal expense, will evaluate the alternatives, select one, and <br />develop project design data, including plans and specifications, The impact of the project on the environment will be documented in an <br />environmental assessment (EA). The decision to approve and construct a project under Section 14 is based on information from the PDA. <br />A draft project cooperation agreement (PCA) is drawn up which defines the obligations of the federal government and the sponsor in the <br />construction, maintenance, and cost sharing of the project. No more than 12 months should pass between the stan of the PDA and the <br />time the project is ready for construction. <br /> <br />WHAT ARE THE LOCAL RESPONSmILITIES? Costs for emergency streambank and shore protection projects are shared between <br />the federal government and a non-fedetal sponsor in accordance with the Water Resource Development Act of 1986, as amended. The <br />first $40,000 of the study funds are 100 percent federal. Any remaining study funds and the costs of construction are shared according to <br />the formula in the law. Credit is given for lands, etc. dedicated to the project, but at least 5 percent of the cost must be provided in cash. <br />
The URL can be used to link to this page
Your browser does not support the video tag.