Laserfiche WebLink
<br />Update existing USGS gages with High Data Rate Satellite Monitoring equipment. $ 35,000 <br />This project entails updating approximately 5 USGS gages, which are of interest to the CWCB <br />with High Data Rate Satellite Monitoring equipment. These gages are currently being operated <br />and maintained by the USGS through their co-op programs, however the sites do not have <br />satellite telemetry capability, which would aid the CWCB floodplain, Stream and Lake <br />Protection, Compact, and DSS programs. A list of gages that have been updated through this <br />ongoing project, as well as gages left to be updated has been compiled and is available for <br />reVIew. <br />Installation of new stream flow gages. $ 30,000 <br />This project entails the installation of new staff gages, data loggers and fully equipped Satellite <br />Monitoring Stations. These gages will be installed by the USGS, DWR or others and may <br />include funding for operation and maintenance for one year. CWCB will attempt to bring in <br />other stakeholders to share in the future O&M costs. <br />Gaging Related Equipment Purchases. $ 10,000 <br />This funding is necessary to update and maintain equipment used for the Gaging Program and to <br />provide for ongoing staff training. Examples of ongoing purchases include mapping software <br />updates, survey and portable gaging equipment purchases and/or repairs, computer hardware <br />uo!!rades and associated software. <br />Total $260,000 <br /> <br />DWR Request <br /> <br />Controlled maintenance ofthe Satellite Monitoring System is an authorized non-reimbursable expense <br />from the Construction Fund (Section 37-60-121 (l)(b)(II), CRS), and it is included in the Board's Long Term <br />Financial Projection. Staff recognizes the value of continuing collection of real-time streamflow data and the <br />benefits to all ofthe CWCB's programs. Staff will be working hard with the DWR and other entities to more <br />thoroughly incorporate the Satellite Monitoring System into the CWCB's expanding gaging program. The <br />details of the DWR Satellite Monitoring System funding request are explained in detail in the attached memo <br />from Hal Simpson to Rod Kuharich dated August 14, 2003. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board request the General assembly authorize $210,000 from the <br />Construction Fund to be appropriated to the Colorado Water Conservation Board for flood forecasting and <br />waming, instream flow monitoring, compact protection, and decision support system data collection efforts; <br />$50,000 for stream gage flood hardening projects; and $303,000 from the Construction fund to be appropriated <br />to the Department of Natural Resources for allocation to the Division of Water Resources to enhance, renovate, <br />and replace the Data Collection Platforms in the existing satellite monitoring system. The total cost of this joint <br />gaging effort is $ 563,000. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />