Laserfiche WebLink
<br />, <br /> <br />Untitled <br /> <br />Page 4 of 4 <br /> <br />. <br /> <br />37-95-123. Construction of article. This article shall be construed liberally to <br />effectuate the legislative intent and the purposes of this article as the complete and <br />independent authority for the performance of each and every act and thing authorized <br />in this article, and all the powers granted in this article shall be broadly interpreted to <br />effectuate such intent and purposes and shall not be interpreted as a limitation of such <br />powers; proviaea, Rev/ever, EXCEPT THAT it is hereby recognized that the primary <br />purpose ofthis article relates to the development of water resources of the state of <br />Colorado as set forth in section 37-95-102 (1), and that the only generation of electric <br />energy authorized hereunder is generation from hydroelectric facilities, sUi3portive of <br />a prejeet, ana This article shall not be construed as to authorize the board to generate <br />electric energy by fossil fuel or other FlonR)'ElremetReas NON-HYDROELECTRIC <br />METHODS. <br /> <br />SECTION 5. Safety clause. The general assembly hereby finds, determines, and <br />declares that this act is necessary for the immediate preservation of the public peace, <br />health, and safety. <br /> <br />. <br /> <br />. <br /> <br />http://www.state.co.us/gov_dir/leg_dir/sessI998/sbills98/sb078.htm <br /> <br />1/21/98 <br />