My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00836
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:30 PM
Creation date
10/4/2006 6:44:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/6/1956
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 3 - <br /> <br />458 <br /> <br />I <br /> <br />3. In light of the comments received from the affected <br />States, and with specific regard to the Comment of the State of <br />Colorado that the project be restudied with a view of determining <br />the most economical size reservoir for the area and other <br />pertinent factors, the project plan was modified. The December, <br />1955 Report of the Department of the Interior has been drafted <br />to conform with the expressed wishes of the State of Colorado, and <br />to take cognizance, insofar as possible, of the comments of <br />other States and Federal agencies. <br /> <br />Description of Project <br /> <br />4. The plan of development contemplates construction of <br />a concrete-arch dam at Wagon Wheel Gap for regulation of the flows <br />of the Rio Grande under terms of the Rio Grande Compact, to provide <br />a supplemental and regulated water supply for 271,000 acres of <br />presently irrigated land. In addition, the reservoir would <br />provide material flood control benefits. There are no power <br />features included. Releases from the reservoir would be made into <br />the channel of the Rio Grande for diversion and distribution <br />through the existing irrigation systems. <br /> <br />5. The following data are from the December, 1955 Report: <br /> <br />Wagon Wheel Gap Reservoir <br /> <br />Ca~ci tj <br />100 Control, unpredictable floods <br />Flood Control, predictable floods <br />Irrigation and Flood Control <br />predictable floods <br /> <br />60,000 acre feet <br />140,000 acre feet <br /> <br />300.000 acre feet <br />500,000 acre feet <br /> <br />Cost Allocation <br />Irrigation <br />Flood Control <br />Recreation <br />Fish and Wildlife <br /> <br />$11,642,000 <br />10,545,000 <br />59,000 <br />325,000 <br />$22,571,000 <br /> <br />I <br /> <br />Annual Benefits <br />Irrigation <br />Flood Control <br />Recreation <br />Fish and Wildlife <br /> <br />Total <br />$1,955,000 <br />590,300 <br />17,300 <br />11 <br /> <br />Direct <br />$1,199,000 <br />590,300 <br />17,300 <br />11 <br /> <br />11 <br /> <br />. , <br />Estimated net losses of $191,000 annually included in <br />annual economic costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.